My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHERRY
>
17531
>
2300 - Underground Storage Tank Program
>
PR0502310
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:45:26 AM
Creation date
11/2/2018 5:23:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0502310
PE
2332
FACILITY_ID
FA0005397
FACILITY_NAME
LOIS LA BOW
STREET_NUMBER
17531
STREET_NAME
CHERRY
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
17531 CHERRY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHERRY\17531\PR0502310\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
7/2/2012 8:00:00 AM
QuestysRecordID
135584
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA r"`¢� °^ <br /> STATE WATER RESOURCES CONTROL BOARD o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� w: <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, `""�^"''. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE O 6 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.R . .'- B. MANUFACTURED BY: !i - <br /> C. DATE INSTALLED(MO/DAY/YEAR) (,/. K- D. TANK CAPACITY IN GALLONS: Zy0 <br /> ILTANKCONTENTS IFAAIS MARKED,COMPLETE ITEM C. <br /> A. 'IMOTOR VEHICLE FUEL ❑ 4 OIL B. 0. ❑ taUREGUN EA EAR <br /> D 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ W PTY 1 PRODUCT lbPREMIUM O 4 GASAHOL T METHANOL <br /> ❑ UNLEADED 5 JET FUEL ❑ <br /> ❑ 3 CHEMICAL PRODUCT UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,S.AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 UMINUM O B 100% METHANOL COMPATISLE W/FRP <br /> (PrlmaryTank) E:7] 9 BRONZE ❑ 10 GALVANIZED STEEL UNKNOWN ❑ W OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING ❑ 6 UNLINED 95 UNKNOWN 99 OTHER <br /> LINING ❑ <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ % OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A&A SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH 95 UNKNOWN-AU 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 S�T,E�E''L],W�/COATING A U B 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION Aidr1 l ' UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 AUTOMATIC LINE LEAK DETECTOR2 LINE TIGHTNESS TESTINGI INT <br /> ❑ MONITORING F-1 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING [:] 4 ATC <br /> TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIALP YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF My KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a S*NANRE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMIT NUMBER P RMITAPPROVED BYIDATE PERMIT EXPIRATION DATE --r— <br /> FORM 8 (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.