Laserfiche WebLink
WORK PLAN UNDERGROUND STORAGE TANK REMOVAL <br /> BACKFILL <br /> The excavation will be backfilled with non-contaminated over-burden and approved onsite and/or <br /> imported fill. The backfill material will be placed in the excavation in such a manner as not to create <br /> unnecessary particulate emissions. The material will be compacted in 12"lifts. <br /> REPORTING <br /> A brief report will be submitted to PHS/EHD that will present a description of procedures utilized, <br /> analytical results, waste manifests, and copies of the laboratory analytical reports. <br /> G:\WAGDMGH4m17E.354 Harding Lawson Associates 3 <br />