My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:51 AM
Creation date
11/2/2018 5:28:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHURCH\800\PR0231063\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> IX. HAZARD MITIGATION <br /> Identify procedures to mitigate all hazards listed in Section VI by placing the task number next to the <br /> appropriate mitigating measure. Listing of standard procedures is not inclusive. A specific procedure <br /> must be entered to mitigate each hazard identified in Section VI. <br /> Activity <br /> List Number A. Mechanical Hazards <br /> 1 Do not stand near backhoe buckets and earthmoving equipment <br /> 1 Verify that all equipment is in good condition. <br /> 1 Do not stand or walk under elevated loads or ladders. <br /> _ 1 Do not stand near unguarded excavation and trenches. <br /> 1 Do not enter excavation or trenches over 5 feet deep that are not <br /> properly guarded,shored, or sloped. <br /> 1 Consult DHSO if other mechanical hazards exist. <br /> B. Electrical Hazards <br /> 1 Locate and mark buried utilities before drilling. <br /> i Utilities to located by:U.S.A. Notification within 48 hours prior to <br /> scheduled drilling or excavation work. <br /> 1 In addition utilities to cleared by a private utility locator on the day of <br /> drilling or excavation work. <br /> 1 Maintain at least 10-foot clearance from overhead power lines. <br /> 1 Contact utility company for minimum clearance from high voltage <br /> power lines. <br /> 1 If unavoidably close to buried or overhead power lines, have power <br /> turned off, with circuit breaker locked and tagged. <br /> 1 Properly ground all electrical equipment <br /> 1 Avoid standing in water when operating electrical equipment. <br /> 1 If equipment must be connected by splicing wires, make sure all <br /> connections are properly taped. <br /> 1 Be familiar with specific operating instructions for each piece of <br /> equipment. <br /> C. Chemical Hazards <br /> 1 Use personal protective equipment indicated in Section 18. <br /> Conduct direct reading air monitoring to evaluate respiratory and <br /> explosion hazards(list instrument, action level,monitoring location, <br /> and action to be taken in Section 19). <br /> NE Consult DHSO for personal air monitoring. <br /> NE = NOT EXPECTED <br /> G:\WP\GDH\GH41017G.356 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.