My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:51 AM
Creation date
11/2/2018 5:28:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHURCH\800\PR0231063\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Il.v -+v JIYTJ IJ/IL •' •.. ..� ..+. 1]LV./V +�++ <br /> Health and Safety Plan <br /> 1.0 introduction <br /> The Newark Paperboard Mills has identified one (1)underground storage tanks containing No. 6 fuel on <br /> (bunker c) <br /> 1.1 The 210,000 gallion underground storage tank is located at 800 West Church St. Stockton,CA. <br /> — 1.2 This Site Specific Health and Safety Plan (SSHSP)has been prepared to set forth the guidelines <br /> for the health and safety issues and appropriate procedures to be followed during on site <br /> remediation. <br /> 2.0 OGISO Environmental Services Division Health and Safety Program <br /> Ogiso Environmental maintains a comprehensive health and safety program consistent with the guidelines <br /> and requirements presented in the following documents: <br /> • OSHA Safety and Health Standards, 29 CFR 1910.120, U.S. Department of <br /> Labor, Occupational Safety and Health Administration, OSHA 2207, 1985. <br /> • OSHA interim Final Standards, 29 CFR 1910.120. <br /> • Army Corps of Engineers Safety and Health. EM 385-1-1, October 1987. <br /> — • .occupation Safety and Health Guidance Manual for Hazardous Egste Site <br /> Activities. NIOSH/OSHA/EPA/USCG,DHHS (NIOSH)publication No. 85- <br /> 115,1985. <br /> 3.0 Key Personnel and Organization <br /> The Health and Safety designees and their general responsibilities are presented below. <br /> Proieet Superintendent is responsible for all site activities including: <br /> .Liaison with the plant superintendent <br /> •Liaison with H.L.A. Project Manager <br /> •Management Division Officials <br /> *Overall project supervision <br /> *Ensuring that health and safety requirements are met <br /> *Briefing field teams on-specific duties <br /> -Controlling site access <br /> • Ensuring coordination of specifications and scheduling with subcontractors. <br /> Site Safety Officer is responsible for developing and implementing the Health and Safety Plan in <br /> compliance with OSHA standards and Ogiso Environmental Health and Safety Policy. These <br /> responsibilities will be fulfilled by Gene Fiedler. Additional responsibilities include: <br />
The URL can be used to link to this page
Your browser does not support the video tag.