Laserfiche WebLink
HEALTH AND SAFETY PLAN <br /> RE: Tank removal -David Dedini <br /> Tank and Product <br /> One (1) 2,000 gallon underground tank storing diesel fuel <br /> The project manager and health and safety coordinator is Lou Tvedt of Paydirt Excavating <br /> Co. Inc. 269 Oregon St. ,Ripon, CA 95366,Phone#(209) 599-2347 pager no. (209) <br /> 995-0122. The site safety officer will be Lou Tvedt of Paydirt Excavating Co. Inc. The <br /> alternative site of safety officer will be George Gilmore of Paydirt Excavating Co. Inc. <br /> Paydirt Excavating Co. Inc., will have on site two (2) fire extinguishers and one (1)first <br /> aid kit within 50 feet of tank location (see map). No smoking will be permitted within 50 <br /> feet of the tank or areas where flammable vapors are present. Two no smoking signs will <br /> be posted at job site. Paydirt Excavating co. Inc. shall notify USA Dig 48 hours before <br /> excavation shall begin. Tank will be emptied of product before start of job. Tank will be <br /> triple rinsed, the rinsate will be pumped from the tanks, stored in barrels and the barrels <br /> will be hauled by American Valley Enviromental, EPA number CAL000121154, address: <br /> 2930 Geer Rd., Turlock, CA 95382, Phone# 1-800-732-4645. Rinsate will be disposed <br /> of at PRC Patterson Inc., in Patterson CA. Dry ice 30 pounds per tank will be used to <br /> inert the tanks. Before lifting of tank, Paydirt Excavating co. Inc. shall monitor tank with <br /> a low explosion level (LEL) monitor. We will seal an openings and one (1) plug will have <br /> an 1/8 inch opening before tank will be transported along with piping. At no time will <br /> Paydirt Excavating co. Inc. cut or weld on site. Tank will be secured on truck after <br /> excavation for transportation. Tank and plumbing will be hauled by by Paydirt Excavating <br /> Co. Inc. to Cal-Coast Mfg. 1540 Lynwood, Turlock, CA 95380, phone(209) 668-9382. <br /> Paydirt Excavating Co. Inc. will approach all tank excavations with possible cave-ins. The <br /> following rules will be followed to prevent any mishaps: <br /> 1. Soil will be inspected for stability before and after removal of tanks. <br /> 2. Soil to be at least two (2) feet from edge of an excavation. <br /> 3. If excavation is five (5)feet or more, the hole shall be tapered, braced, or other <br /> equipment methods shall be used to prevent possible cave-ins, precautions will be at all <br /> times. <br />