Laserfiche WebLink
.� <br /> STATE OF CALIFORNIA �"� <br /> STATE WATER RESOURCES CONTROL BOARD '? <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� =^ <br /> I <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED O <br /> DBA OR FACILQY NAME WHERE TANK IS INSTALLED: ZO GlvF7� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# (7 B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: ��� &VZJ ) <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. to REGULAR UNLEADED 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY �, I PRODUCT ❑ tb PREMIUM UNLEADED 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 8 MBS <br /> 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE O 2 MSD DE UNLEADED 99 OTHER(DESCRJET FUEL IBE N ITEM D.BELOW) <br /> D. IF(At)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A 3,AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK I BARE STEEL O 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD Wt FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 10D% METHANOL COMPATIBLE W/FRP <br /> (Primmy Talk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER UNED /ppO 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS UNING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS UNING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINF%RCBTIC <br /> CORROSION �yYY--�� �Fa <br /> PROTECTION ❑ 5 CATHODIC PROTECTION O91 NONE ❑95 UNKNOWN �`I 99 OTHER <br /> E.SPILL AND OVERFILL,9(0. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO_ STRIKER PLATE YES NO DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION ALV2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION rV I SINGLE WALL A U 2 DOUBLE WALL A U 3 UNED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B IDD% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION pLW95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 MEC6 Mm Uri UE 2 USE nrHT9 ❑3 CMNUCUS NTEBS ❑4 ELECTRONIC UKQ s Aaarullc Purr ❑ 99 OTHER <br /> DET am TEsn90 MoHro m UAK oETECTaI A== <br /> V.TANK LEAK DETE ION <br /> ❑ 1 VISUAL CHECK MANUALRECONCIUATIONORY ❑ 3 MO ORING ❑ 4 GAUD NG AUTOMATIC TANK ❑ 5 MONITORING GROUND �R 6 TESTINGANNUALTANK <br /> ❑ 7 CONTINUOINTERSTITIAL O SIR ❑ 9 WE KL MANU ❑IO TESTINGY TANK El 95 UNKNOWN ❑99 OTHER <br /> MONITORINGVI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRIN 4SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D:# m .9 yy% <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT P' FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THF 'IERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) `i '—w <br />