Laserfiche WebLink
STATEOFCAUFOIUTA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ED7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT F74 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.# S. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-11SMARKED.COMPLETE REM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 6 OIL B. 0- aUNLFAL DED 3 DIESEL ❑ 8 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY PRODUCT ❑ 1D PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> ❑ ❑ ❑ ❑ 2 LEADED O 99 JOTHERL(DESCRIBE IN ITEM O.BELOW) <br /> 3 CHEMICAL PRODUCT 95 UNKNOWN 2 WASTE <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTR TION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> S. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYO LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINUi% <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 8 UNLINED ❑ 95 UNKNOWN ❑ w OTHER IA`I'i <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO_ <br /> D.CORROSION ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EOUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A DOUBLE WALL A U 3 LVED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A(95 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 8 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> 0. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ O MONERSTIT IAL <br /> ITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING F-15 GROUND WATER MONITORING <br /> e TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.E ESTIMATED DATE LAST USED(MO/OAY/VR) 2.ESTIMATEDOUANTITYOF 3.WAS TANK FILLED WITH YES ❑ �❑ <br /> SUS STANCEREMAINING GALLONS WERTMATERIAL7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> IRRWN DA 3WNANREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# �FACILITY � TANK# <br /> STATE I.DA m L_Ll�ll <br /> PERMIT NUMBER PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATE <br /> FORM a (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> v / FOROO1tORS <br />