Laserfiche WebLink
INIFIED PROGRAM CONSOLIDATED FORK <br /> UNDERGROUND STORAGE TANK <br /> MONITORINGPLAN (Page2of2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54 <br /> 490-546 <br /> 10 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 4.NO DISPENSERS99.OT R(S eci : <br /> PANEL MANUFACTURER: �'�.� MODEL R: S —:Z) 490-56. <br /> LEAK SENSOR MANUFACTURER: L( 490-57 MODEL#(S): 3"- ZO'y 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS &a.YES ❑b.NO 4W59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 19p a.YES ❑b.NO 490° <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Iff a.YES ❑ .NO 49061 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES b.NO 49o.62 <br /> 2.UDC CONSTRUCTION IS OLSINGLE-WALLED X72.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY:_W.LIQUID ❑2.PRESSURE ❑3.VACUUM _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS nQ.YES ❑b.NO <br /> VII.PERIODIC SYSTEM TESTING <br /> L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65_ <br /> LEAK DETECTION(ELDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49 <br /> .SPILL BUCKETS ARE TESTED ANNUALLY. a9osr <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 49o-633 ❑Visual Inspection Records 490-686 ❑Tank integrity testing results 490s8c <br /> SIR testing results(and supporting documentation records). 490bgd ❑ Tank gauging results(and supporting documentation records). 49o.6ae <br /> ❑ATG Testing results(and supporting documentation records).49o-6af ❑ Corrosion Protection 60-day logs 49 89 <br /> 1;3)Equipment maintenance and calibration records. 490s8h <br /> LY.TRAINING <br /> 9-'Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-693 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490 % <br /> Q OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49o-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS e9069d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW a9 % <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"a9a69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490698 <br /> ❑ OTHER(Specify):M69h,M69i <br /> Pg This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Opemtoe'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> • Operation of the UST systems in a manner consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Names of contact persons)for emergencies and monitoring alarms.490-30 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> E- Art-�Ow,.w 6211:36170 eiAlrz <br /> XI-PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following erson(s)are sponsible for erforming the monitoring and equipment mainten e: <br /> NAME 490-72 TITLE 49o.71 <br /> NAME 490-04 TITLE 49o75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICA NA 49x76 DATE: 490-77 <br /> n� r 3 Authorjndai= 4 3 2- <br /> APPLICANT <br /> APPLICANT NAME(print): 090-08 APPLICANT TITLE: 490-39 <br /> '\ �_- <br /> UPCF UST-D(12/2007)314 <br />