My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:22:42 PM
Creation date
11/2/2018 5:38:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/26/2016 3:50:54 PM
QuestysRecordID
3092866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVEI <br /> UST SYSTEM RETROFIT OR REPAIR f�1 NOV 18 pg2015 q <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained byENVIRONMENTAL <br /> NFAITW nC0AOTAWkM <br /> 1. Site map enclosed? YES[] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Brake-out concrete and repair the existing man-way lid on the 87-Unleaded fill sump-raising metal sump <br /> ring. <br /> Install new reducer boots, band clamps, inner sump lids and sump gaskets on the 87-Unleaded <br /> gt-Premium,and Diesel fill sumps <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 7. Franklin Fueling WFR-1013 reduoding boots with clamps.4(87)Unleaded Sump 2-(91)Premuim Sump 1-Disesl Sump <br /> 3, Western Fiberglass Type B gaskets kit-cauking, hold downs,nuts, and screws -all three sumps <br /> 3 Western Fiberglass Custom Lids Part#TAL 33CU-alt three sumps <br /> 1 Western Fiberglass Custom fit Sump Shield Part#TAL-MTP Unleaded Sump <br /> 1 Western Fiberglass Retrofit Kit Riser Reduoder Type B Part#TA9985.Unleaded Sump <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.