Laserfiche WebLink
SWIRCB,January 2006 <br /> Spill Bucket Testing Report <br /> 1. FACILITY INFORMATION <br /> Facility Name: ARCO AM PM#83230 Date of Testing: 10/23/2018 <br /> Facility Address: 1 340 W.Colony Rd. Ripon,CA 95366 <br /> Facility Contact: Ranjeet Phone: (209)5794014 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services,Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor Licenser 1005444 ICC Certification n 5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Hydrostatic <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution: 1/16" <br /> Identify Spill Bucket(B'v Tank T1: 87 M West Fill T1: 87 M East Fill T2: 91 Fill T3: Diesel Fill 1 <br /> Number,Stored Product, etc.) <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Buri <br /> x Contained in Sump x Contained in Sump x Contained in Sump x Contained in Sum <br /> Bucket Inside Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 15 3/8" 143/4" 16" 16 <br /> Wait time between applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 4:35 p.m. 4:40 p.m. 4:50 p.m. 4:45 p.m. <br /> Initial Reading(Ri): 14" 14" 15" 15 '/Z" <br /> Test End Time(TF): 5:35 p.m. 5:40 p.m. 5:50 p.m. 5:45 p.m. <br /> Final Reading(RF): 14" 14" 15" 15 %z" <br /> Test Duration(TF—Tj): 1 hr 1 hr I hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 1/8" 1'S" 1/8" 1/8" <br /> Criteria: <br /> Test Result: x Pass 0 Fail x Pass 0 Fail x Pass 0 Fail x Pass 0 Fail <br /> —Comments: <br /> Technician's Signatur • �—, Date: 10/23/2018 <br />