My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:22:42 PM
Creation date
11/2/2018 5:38:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/26/2016 3:50:54 PM
QuestysRecordID
3092866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed If LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ 11Check all that a Simulated leak rate verified: E 3 GPH ❑0.1 GPH El 0.2 GPH <br /> Was the testing apparatus properly calibrated? E ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ E <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ E <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? E ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? E ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? E ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? E ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? E ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For any answer of"N"above describe In section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> LaXIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENTT T <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring Is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) E Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor lD Component(s)Monitored by this Sensor Test Test <br /> S9 87 PRODUCT VAC E Pass ❑Fail ❑Pass ❑Fail <br /> S10 91 PRODUCT VAC E Pass ❑Fail ❑Pass ❑Fail <br /> S11 DIESEL PRODUCT VAC E Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑ Pass ❑Fail <br /> How was interstitial communication verified? ®Simulated leak at far ends of the interstitial space. ❑Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? E Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above describe In section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> r.PH=r dhvm naw tvr rr V=Vac N=Nn NO=Nr&annrirallo VPH=Van a tnrPrpcei m.JHvrirnctatir. in=Wwi ffk--w nn <br />
The URL can be used to link to this page
Your browser does not support the video tag.