My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:22:42 PM
Creation date
11/2/2018 5:38:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/26/2016 3:50:54 PM
QuestysRecordID
3092866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ File MH 19409 Vol. 1 Sec. 1 ILL-9(Page 1) Issued:1996-05-29 <br /> is �ti <br /> And Report <br /> MANUFACTURING PROCESS(DOUBT,F.-WALL TANK SUMPS) <br /> Step I). Load creel,FRP birand rack i tr A't i V E <br /> Stsp 2). String fiberglass strands to bath and guide. � <br /> Step 3). Wrap mandrel with mylar. NOV 13 2015 <br /> Step4). Measure out resirtibardaner ratios into nomaimltent vessels. +Y Ylj]/'jn�7hpEA,TA <br /> Step 5). Set winding speed and lay-up counter on filament winding machine. 'Y'^Y"I—LJ <br /> LJmc�DAI�RTIIAFN/T'1 <br /> Step 6). Catalyze 2.3 gallons of*win material. <br /> Step 7). Pour resin material into bath receiver, Prepare adt itionai 2-3 Sellars of <br /> resin mat"Ibr calalyzation. <br /> Step 8). Start machine. <br /> Step 9). Lhring rotation,squeegee excess resin material riom mandrel into <br /> containerasresinisapplied. Aetum excess resin to bath rert'tver. <br /> Step 10). Visually inspect mmtdid length during winding procedure for roues <br /> filament aligimtant,delaminatiore,resin comem,sir bubbler and maintain <br /> bath meeiver resin level <br /> Step 11). Observe counter. Eighty passes or cyclol far 36 in.and 42 in,diameter <br /> .,amps,ninety,passes or cycles for 48 in.diameter sump. Part ttdakness <br /> 3116 in.,200 mils nominal. <br /> Step 12). Cut strands,continue mandrel rotation and squeegee for 10 min. <br /> Step 13). Rotate inandroi until entad. Stop mandrel. <br /> Step 14). Visual inspection of part for any defects or inconsistencles. <br /> Step 15). Rotate mandrel and scribe pan for sump length tutting attrr removal. <br /> Step 16). Attach removal apparatus and remove. <br /> Step 17). Cit on Scribe marks: <br /> Step 18). Sand outer surface of sump body.Wet out and apply layer of Purabeam <br /> cloth(or equivatem). Let cure. <br /> 0040040342 <br />
The URL can be used to link to this page
Your browser does not support the video tag.