Laserfiche WebLink
UrTMIED PROGRAM CONSOLIDATED FO <br /> PRESUBMITTAL TANK <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VI.PIPING CONSTRUCTION check an that a Page 2 of 4 <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ®I.PRESSURE ❑2.SUCTION [13.GRAVITY 458 ❑1,PRESSURE ❑2. SUCTION [13.GRAVITY 459 <br /> CONSTRUCTION 0 1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460 ❑1.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER AO Smith 461 MANUFACTURER_ 463 <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE wAwl. METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100 MEMANOL <br /> [12.STAINLESS STEEL 0 7.GALVANIZED STEEL ❑Unknown ❑2. STAINLESS STEEL 0 7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑99. Other [13. PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99. OTHER <br /> ®4.FIBERGLASS ❑8.FLEXIBLE(HDPE) [14. FIBERGLASS ❑9.CATHODIC PROTECTION <br /> [15.STEEL W/COATING ❑9.CATHODIC PROTECTION 464 [15. STEEL W/COATING 0 95.UNKNOWN 465 <br /> VII.PIPING LEAK DETECTION(Check all that apply)(A dacriptioa ofthe mormormIl program shall be submitted to the tical agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑ 1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT ❑I. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS. AUDIBLE AND VISUAL ALARMS. <br /> ❑2.MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> ❑3.ANNUAL INTEGRITY TEST(0.1GPH) [13.ANNUAL INTEGRITY TEST(0.1GPH) <br /> [14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> [15.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUND PIPING): ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17.SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> D 8. DAILY VISUAL MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSORWITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check erre) <br /> ®a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a AUTO POMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> []c. NO AUTO PUMP SHUT OFF Oc NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) FLOW FLOW SHUT 11 AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ®12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW [115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> 0 16.ANNUAL INTEGRITY TEST(0.1 GPH) [116.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK [117. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT [11.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE [14.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 ®2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> 2003 ®3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR 6.NONE 469 <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> Icertify that the inPom <br /> ration providadbleFghtt.,orate to the bat of my knowledge. <br /> SIGNATURE OF O=T DATE 470 <br /> 0.R.LE�PkI Apri124,2003 <br /> NAMEOFOWNE (pri t) TITLE OF OWNER/OPERATOR 472 <br /> Chevron Pro In mpany/D.R. LERI Retail ESH Specialist <br /> Permit Number(For tical us.mdy) 473 Permit Approved(For tical use only) Permit Expiration Date(For tical use only) 475 <br /> UPCF(1/99 revised) 174 Formerly SWRCB Form B <br />