Laserfiche WebLink
itoring System Certification • <br /> Site Address: 1440 COLONY DR. Date of Testing/Service: 04/04/2005 <br /> F. In-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> x❑Yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑x Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> QYes ❑No' Was accuracy of system product level readings tested? <br /> Mves ❑No• Was accuracy of system water level readings tested? <br /> FXJ Yes ❑No• Were all probes reinstalled properly? <br /> ❑X Yes I ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) ; ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> 0 Yes ❑No• E]N/A (Check all that apply)Simulated leak rate: X❑ 3 g.p.h ❑0.1 g.p.h 00.2 g.p.h <br /> X Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes ❑No' Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No• ❑x N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> QYes ❑No• ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> Q Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> lex❑Yes ❑ F-1No• N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> U Yes :EJ�N= Were all Items on the equipment manufacturers'maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />