My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMMERCE
>
729
>
2300 - Underground Storage Tank Program
>
PR0504588
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:37:26 AM
Creation date
11/2/2018 6:01:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0504588
PE
2381
FACILITY_ID
FA0006252
FACILITY_NAME
BOGGS STEEL FABRICATION INC
STREET_NUMBER
729
Direction
S
STREET_NAME
COMMERCE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14713003
CURRENT_STATUS
02
SITE_LOCATION
729 S COMMERCE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COMMERCE\729\PR0504588\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/2/2012 8:00:00 AM
QuestysRecordID
139463
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t�50 " t <br /> STATE OF CALIFORNIA J e, <br /> STATE WATER RESOURCES CONTROL BOARD ;' - <br /> C//UNDERGROUND STORAGE TANK PER PPLICATION- FORM B �� e <br /> � , ; <br /> COMPLETE A SEPARATE FORM FOR ACH TANK SYSTEM. c""°""" <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM F72 INTERIM PERMIT F7 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ® 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 729 So . Commerce Stockton <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# ;.-- B. MANUFACTURED BY: Unknown <br /> C. DATE INSTALLED(MO/DAY/YEAR) Unknown D. TANK CAPACITY IN GALLONS: 1000 <br /> II.TANK CONTENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> A. ® 1 MOTOR VEHICLE FUEL O 4 OIL 8. C. ❑ REGULAR <br /> 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ w EMPTY ® 1 PRODUCT 1b PREMIUM LJ 4 GASAHOL 7 METHANOL <br /> O UNLEADED ❑ 5 JETFUEL ❑ <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE iN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.8,AND C.AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF ® 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ® 1 BARE STEEL ❑ 2 STAINLESS STEEL F--] 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 6 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 70 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ® 6 UNLINED O 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ® 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A&1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A&)1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A©9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN <br /> A u 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINETIGHTNESS TESTING ❑ MONRORING ®99 OTHER None <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATEDDATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> Unknown SUBSTANCE REMAINING 2O GALLONS INERTMATERIAL7 YES ❑ NO® <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE IS TRUE AND CORRECT <br /> ICANTS NAME DATE <br /> IASIGNATURE) Fredrick C . Clarke - 12/5/91 <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D.# <br /> COUNTY# JURISDICTION# FACILITY# �TANK#3 9' = I 1a S S (. 1 1 1 liog <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> V l uc-e 72— ��� FOII7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.