My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/2/2018 6:07:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2016 - PRESENT.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec fy) <br /> Test Equipment Used:Pressurized air and Gauges Equipment Resolution:0 loss <br /> Supply UST Return UST <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3"over2" 3"over2" <br /> Length of Piping Run: 70' 70' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test boots Test boots <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 20 min 20 min <br /> starting test: <br /> Test Start Time: 11:30 11:30 <br /> Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 12:30 12:30 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: I hr 1 hr <br /> Change in Reading(RF-Ri): 0 change 0 change <br /> Pass/Fail Threshold or 0 loss 0 loss <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.