Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec fy) <br /> Test Equipment Used:Pressurized air and Gauges Equipment Resolution:0 loss <br /> Supply UST Return UST <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3"over2" 3"over2" <br /> Length of Piping Run: 70' 70' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test boots Test boots <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 20 min 20 min <br /> starting test: <br /> Test Start Time: 11:30 11:30 <br /> Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 12:30 12:30 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: I hr 1 hr <br /> Change in Reading(RF-Ri): 0 change 0 change <br /> Pass/Fail Threshold or 0 loss 0 loss <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />