My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 6:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2010 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o,�qu l ty•.o <br /> SAN JOAQUIN COUNTY <br /> W: { NVIRONMENTAL HEALTH DEPARTMENT <br /> I- 9868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209)468-3433 Web:www.s[gov.org/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> {►h� CUMrnInv�IC� �5 r q— 13 <br /> Facility Ad ress: Service Request#: <br /> 315o)-7 �►�- ��� Avg �� �'fz����� � <br /> Onsite Service Tec ician's Name: I Service Technicianlinstaller Exp.Date: Manufacturer Training: r <br /> SERVICE SERVICE <br /> Leak detector <br /> ❑ mechanical Model: 1 Spill bucket ,M�inimum 5 gallon <br /> ❑ ❑ 1 hour hydrostatic [�Incon TS-STS <br /> ❑ electronic Serial#: � Y <br /> ❑ line test pro rammed ❑ Caldwell System ❑ Other <br /> Leak detector <br /> ❑ mechanical Model: Spill bucket ❑ minimum 5 gallon <br /> D electronic Serial#: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test programmed ❑ Caldwell System ❑ Other <br /> sensor <br /> ❑ positive shutdown Model: Primary piping testing at: <br /> El <br /> F-1 fail safe Serial #: ❑ psi <br /> D NA minutes <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> El fail safe Serial #: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by.- <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial#: <br /> F-1 NA Note, Please be aware that 2°containment components are required to be tested upon <br /> Installation,6 months after,and every°..6 months thereafter, <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other. see below <br /> This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Ins or: Receiv y: Title: <br /> . � -- <br /> EHp 23 <br /> Rev 4/30192 UST SERVICE REQUEST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.