My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 6:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2010 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW EDGE"" Double- Materials <br /> Wall Spill Containers Cover: Cast aluminum orcast iron <br /> Mounting ring: Duragard®coated <br /> Designed in collaboration with ductile iron — <br /> contractors and end-users, the NEW Bellows: Polyethylene � .. <br /> OPW EDGE" Double-Wall Spill <br /> Container installs in the same space as <br /> Base: Cast iron E-coating <br /> single-wall buckets.The EDGE"delivers <br /> Clamps:Stainless steel i <br /> best-in-class features that significantly Seals: Buna-N <br /> improve reliability, installation,testing <br /> and ease of serviceability.The EDGE" y r = F <br /> exceeds the performance levels of all Features� _ <br /> other double-wall spill containers. <br /> + Top Mounted Vacuum Test Port <br /> `y y <br /> + Unbeatable installation ease <br /> For quick and easy access w f <br /> • Uses existing riser pipe <br /> + Superior Visual Gauge A <br /> No messy dipsticks to contend with <br /> • Unparalleled serviceability ! + Patent-Pending Ledge Desi <br /> • Significantly simplifies and reduces g 9 9n <br /> + Superior quality testing time • Provides machined sealing face for <br /> • Significantly reduces installation time + Ease of Access to the Electronic drop tube <br /> and labor costs Sensor for Testing Improves overall drop tube sealing <br /> Easy access for testing integrity <br /> Located to eliminate damage potential Eliminates face seal adaptors or <br /> ` 16-5la" during product drops de-burring of the riser pipe to obtain <br /> + Rota-Molded Primary&Secondary a flat surface for the drop tube <br /> Buckets + Patent-Pending Removable Adaptor <br /> Thicker walls for greater durability and Allows for quick and easy access to <br /> reliability drop tube <br /> 16-17!32" <br /> Grade level + Ribbed Polyethylene Skirt Design Eliminates the need for cumbersome <br /> to riser pipe chain wrenches <br /> Roto-molded for long-life durability <br /> ♦ <br /> • Prouder rigidity for added durability Bellow Seals <br /> • Provides handles on all sides for ease Improves overall sealing integrity <br /> of instaflation Eliminates mess and curing time <br /> ♦ <br /> Patent-Pending Socket Design <br /> found in sealants <br /> Enables the EDGE-to install into the Reduces service time and costs <br /> space of a single-wall spill container <br /> Weight:120 lbs.(54.5 kg.) •Helps to align bucket on riser <br /> Listings and <br /> C> PO VV0 Certificatlon5 ryllssauriAENRApproyeq <br /> R�c m,yny <br /> CAM <br /> California Air Resources Board <br />
The URL can be used to link to this page
Your browser does not support the video tag.