Laserfiche WebLink
F. In-Tank Gauging/,SIR Equipment: x Check this box if tank gauging is used only for inventory control. <br /> C1 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the folio M2 checklist: <br /> 19 Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Ol Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> o Yes ❑ No* Was accuracy of system product level readings tested? <br /> ® Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> 77 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the SectionH,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): x Check this box if LLDs are not installed. <br /> Com lete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p,h; ❑0,2 g,p,h. <br /> ❑ Yes U No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> r <br /> Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments-, <br /> I <br /> Page 3 of 3 03/01 j <br /> i <br />