Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FOR <br /> UNDERGROUND STORAGE TALK <br /> MONITORING PLAN - (Page I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2,CHANGE OF INFORMATION 490-1. <br /> PLAN TYPEl.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAIv (Same as Facility Name or DBA) 3' <br /> -S f tL 1 ,111 <br /> BUSINESS SITE ADDRESS 103 CIT( [ 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes.Linc leak detectors,etc)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever i5 more frequent.Such work must be13erformed by qual i hed personnel.[21 CCR§2632,2- <br /> 634,2638,2641] <br /> - -- <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY El99.OTHER(S ecit 490-3a <br /> P Y) 490-36. <br /> Ill. MONITORING LOCATIONS <br /> ❑ I NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN LVI SITE PLOT PLAN/MAPPREVIOUSLY SUBMITTED [23 CCR§2632.2614[ 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h"ec Ill <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACF(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632.2634] <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY Xb.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: VT--&>rte- dT' 490-7 MODEL#: 'T'L & - .S��U 490.8. <br /> LEAK SENSOR MANUFACTURER: %f A-r-h T%A_ 11 s s-; 490-9 MODEL#(S): ca Z, 490.10. <br /> ❑ 2,AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK 5 .[23 CCR§26431 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14, MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> PROGRAMMED TESTS: ❑ a.0,l h. Elb.0.2 h. F] c.OTHERS ci 490-I8. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1) 490-20. <br /> -__.-,_.____,-_.... -------._.-_-- <br /> 21. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-22. <br /> El5.TANK INTEGRITY TESTING PI:R 1'3 CCR§2643 1] 89823. <br /> _TEST FREQUENCY: ❑ a.ANNUALLY b.BIENNIALLY ❑ e.OTHER(S ci 490-24. <br /> Q ❑ Pc__fy); <br /> ....._.... 490-26. <br /> ❑ Q9.OTHER(Spec4l ) 490-27_ <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS (Cheek all <br /> ( � that a !v) <br /> I.CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S)AND OTFIER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 49p-28. <br /> I§2 36j SECONDARY CONTAINMENT IS: a.DRY F1 b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 890-29. <br /> PANEL MANUFACTURER: y&Cy;S ft ll(, /10 0'r" 490-30_ MODEL#: :2 jib 490-31. <br /> LEAK SENSOR MANUFACTURER: J rtl�tl>J A-> 0-r 490-31 MODEL#(S): 2--0I 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.YES;(b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a,YES b.NO 490-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-16. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): 490-37. MODEL#(S): 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 49040. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST' ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> _ _ST FREQUENCY: ❑ a.ANNUALLY [3b.EVERY 3 YEARS ❑ c.OTHER4e0a6, <br /> TE <br /> ----------..__-__---___ _..,,_...,..-..._ (Specify) <br /> .890-47......._ <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> *dllowed For monimfing of unburied emer-gencXjqeoerator fuel gipm er HSC tt25381.5(bx3�_ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(8)(3)1 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51490-52. <br /> ❑ 99,OTHER(Specify) . <br /> 490-53.-53. <br /> UPCF UST-D(12/2407)-114 www.unidocs.org <br />