Laserfiche WebLink
Underground Storage Tanks A(- Set submit� <br /> Submitted for CERS ID 10151123 on 11/27/2013 4:04PM by Pete Wan of Sprint United Management Co, (Overland Park KS) <br /> Submittal was NotAcceptedon 12/19/2013 by Garrett Backus for San Joaquin County Environmental Health <br /> Comments by regulator: Garrett Backus San Joaquin County Environmental Health Department gbackus@sjcehd.com(209)468-2986: Please correct the <br /> following:Tank information-enter"yes"for the isolation choice in the corrosion protection section. Isolation means all metal components underground are <br /> isolated from the backfill by nonmetal secondary containment. In the UST monitoring plan the panel manufacturer and model should be Weeder Root"and <br /> "TLS-300C" according to the monitoring system certification results. Pipe monitoring should be"yes"using a Weeder Root""208" liquid sensor in the tank <br /> top sump. The system also has "visual monitoring"monthly and every time the system is operated. The monitoring site plan does not include all <br /> aboveground piping attached to the UST system.Add all of the aboveground piping to the site plan.The UST Certification of Financial Responsibility <br /> document consists of the insurance document only.Also include the Certificate of Financial Responsiblity form. A template is in the CERS system. Correct <br /> immediately. <br /> Tuesday,Jul 29,2014 09:56 AM <br />