My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 6:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2010 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: x Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or Slit equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforin leak detection monitoring. <br /> Cont lete the folio ing checklists <br /> 0 Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Cx.l Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> C1x Yes ❑ No* Was accuracy of system product level readings tested? <br /> Q Yes ❑ No* Was accuracy of system water level readings tested? <br /> 0 Yes ❑ No* I Were all probes reinstalled properly? <br /> [x�Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): x Check this box if LLDs are not installed. <br /> Cam lete the follo ing checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check ali that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ Na* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flour if it detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLD9,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑ Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or discormected? <br /> 13 Yes ❑ No's For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Ll N/A <br /> ❑ Yes ❑ No* Were all items on the equipment Ynanufacturer's maintenance checklist completed? <br /> *In the Section EI,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 t <br /> f <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.