Laserfiche WebLink
A KNOLOG VaCUTectTm TEST REPORT <br /> -=0 S.O. # <br /> TECHNOLOGY 1 TM/N <br /> ECHNIRGY FORNMENT Date <br /> Owner 3 SPF:INT Site # -8- 33 <br /> Phone <br /> Invoice Name/Address STOCKTON E ERV T C'E ISTATICN EQUIPMENT P .O . FOX 508 STOC'KTON , CFS 95201 Attn: = i��P.:^C?N <br /> Site Name/Address US SPRINT 3807 CORONADC - <br /> TANKS LINES rExisl <br /> Det <br /> TANKS and LINES Tested to CFR-40 Parts <br /> Ullage 280-281 &NFPA 329 Spec's. <br /> See Water Bubble Air Line Final <br /> Tank Dipped Dipped Probe FMaterial <br /> Delivery LINE LINE Leak LINE NEW <br /> Dia.8 Water Product Water Ingress Ingress Ingress TANK Syst.Type TEST TEST Rate ■ LD(s) <br /> Material Level Level Level Detected Detected Detected ■ ■ E ■ rightTested Other: <br /> ST/ ■ ■ ■ ■ ■ ■ Tight or or & <br /> SS <br /> Tank Tank Tank <br /> FRP/ START START START <br /> or START END <br /> # Product Capacity <br /> Lined END END END Yes/No Yes/No Yes/No Fail Line� FRP PS/SS/GS <br /> TIME TIME GPH Fail NONE PA <br /> "1 F—t LD SN1MDLfMFG. <br /> - - - __ i ,,, ,. ._ _ � �.. <br /> Newl2nd LD SNfMDL1MFG: <br /> Diameter <br /> LINE TEST PSI <br /> Percent o Fill al. ump <br /> Material Start Time: Time of rest: - Mf .' Ose glee'es no Valves <br /> Tank robe Inclinometer <br /> End Time T t PSI: Ent-: D r s: - <br /> Ealsl LD SN/MDLlMFG: <br /> tameier <br /> New12nd LD SNIMDLfMFG'. <br /> LINE TEST PSI <br /> at umP <br /> atenal ercent o Start Time: Time of Test. Mf9.: Dlepenser shear valves <br /> - r0 a nGhnpmeler O prate eslnop <br /> End Time: Test PSI: Ent : De reps: <br /> Diameter Exist LD SN/NtDL/MFG'. <br /> Newl2nd LD SNIMDLlMFG: <br /> LINE TEST PSI <br /> ercenl o I at ump <br /> ateria Start Time: Time of Test: Mf .. o0e'atser eS/--valves <br /> robe <br /> nclinometar o prate eslnoi <br /> En Time, 7-1 P t'.7407- Ent : De reeS7 - Eris!LD SN/MDL/MFG: <br /> ameter <br /> Newf2nd LD SNIMDLlMFG', <br /> - -'—+-- LINE TEST PSI <br /> �er' t o I l at Gmp Dspenser Shea.valves <br /> -MaterialStart Time: Time of Test: Mfg.: <br /> Opera <br /> erase I eslno <br /> ar. roe ne Inometer <br /> En Time: Test PRI- Ent De r Exist LD SN/MDL/MFG. <br /> Diameter <br /> New72nd LD SNIMDLlMFG: <br /> LINE TEST PSI'- <br /> rcent o r' at Lim <br /> MaterialStart Time: Time of TesC Mfg: DIsPenser Shear valves <br /> InC ro e momeler O eraRe esm <br /> Tankrid Time: Ti,,M PSI: En © r <br /> Exist LD SNIMDUMFG. <br /> Diameter <br /> New72nd LD SNIMDLlM FG. <br /> LINE TEST PSI: <br /> reent o III at �rnp <br /> ateria Start Time: Time of Test Dispenser Shear Valves <br /> Mfg.: 0 plata Sh— <br /> an corse nanometer <br /> End Time: Test P 4: Dearee <br /> Tanknology Corporation International <br /> 43ESri'EPN P.E�? Vii: 5225 Hollister St., Houston, TX 77040 <br /> TANKNOLOGY Region: Unit # State Lic. # State: <br /> ' (800) 888-8563 9 FAX (713) 690-2255 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on tile. <br /> TAK-0 i <br />