My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 1990 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/2/2018 6:12:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2004
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 1990 - 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK INSPECTION RECORD <br /> ' NEW TANK INSTALLATION <br /> SITE NAME �• TINSPECTTO/R'S NAME <br /> /��/ <br /> ADDRESS ') Q�i -��'7�t rsrl ee s--e�n _ CITY T J [ /L Y Z7YZ-i 21P <br /> CONTRACTOR: NAME PHONE <br /> OWNER: NAME PHONE <br /> � a <br /> D[S INSPECTOR'S <br /> DATE kPPROVED kPPROVED INITIALS <br /> ITEM OR EQUIPMENT INSPECTED <br /> Fees paid <br /> Plans Approved <br /> INITIAL INSPECTION <br /> . UL numbers tank size <br /> Tank tested upon delivery [Holiday (ptasteel) or air at 5 PSI (FRP)] <br /> S. Visual inspection of secondary containment_ <br /> Tank appropriately placed with approved backfitl. <br /> fl <br /> IPING STAGE INSPECTION <br /> S�rr(4t41. Pressure test of piping. [Primary and Secondary (NFPA 30)I <br /> C -fO2. Sall float valves installed. <br /> �J <br /> 3. Overfill protection installed, describe: <br /> ir <br /> 4. Unused tank opening sealed and catholically protected. <br /> lMi �, S. Visual inspection of secondary containment on piping. <br /> �� <br /> �3 C C2. 6. Monitoring ports In place and brought to grade. (lockable weather proof covers) <br /> 1�11� T. Fill and vent piping brought to grade. <br /> 8. Product tine leak detector in place. (Hard aired) <br /> 9. Approved tank leak monitoring device installed. <br /> 0. All galvanized piping and fittings properly wrapped. Fi�, << lit_ <br /> 1. Pressure decay test on complete tank and product delivery system. <br /> hFINAL INSPECTION <br /> 1. Precision test successfully completed and hard copies received. (NFPA 329) <br /> 2. Spill protection at fill pipe. <br /> 3. Performance test of overfill protection system. <br /> 4. Performance test of product line teak detector. (Hard wired) <br /> 5. Performance test of continuous monitoring system(s) on tank (s) <br /> 6. Permit to operate application complete. <br /> 7. Acceptable recordkeepirg system. <br /> EH 23 006 10/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.