My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 1990 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/2/2018 6:12:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2004
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 1990 - 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION lA <br /> ARTICLE 3, SECTION 2631 <br /> MOTOR VEHICLE OR NONMOTOR VEHICLE FUEL TANK <br /> CONSTRUCTION STANDARDS <br /> ,,�' eGv - w GG'z�%►��j f'�- T��A,� <br /> v 1 . S e c o n d a r d containment provi dease ecla-z r <br /> Primary containers shall be product tight. <br /> 3. Secondary containers <br /> A. Thickness, density, composition, and product compatibility. <br /> B. Sized to contain unauthorized releases for sufficient time to allow <br /> detection and removal . <br /> 4. Secondary container volumetric requirements <br /> A, Single primary container = 100%. <br /> B. Multiple primary containers = 150% of largest primary container or <br /> 10% above aggregate. <br /> 1 . Document interproduct compatibility <br /> 5. Secondary containers open to rainfall . <br /> A. Volumetric requirement = 24 hours of 25 year storm in addition to <br /> primary container volumes. <br /> 6. Pore space of granular material used as backfill for the primary containers. <br /> A. Refer to Section 2631 (8) . <br /> 7. Secondard container equipped with a collection system. <br /> A. Designed to: <br /> 1 . Accumulate <br /> 2. Temporarily store <br /> 3. Permit removal of; <br /> a. Precipitation <br /> b. Subsurface infiltration <br /> c. Released hazardous substances from primary container(s). <br /> 8. Floor of Secondary container <br /> A. Constructed on firm base <br /> B. Sloped to collection sump (1/8" per foot) . <br /> 1 . One or more access casings installed in sump <br /> a. Sized to allow removal of collected liquid <br /> b. Extend to ground surface <br /> c. Perforated in sump region. <br /> d. Covered with a locked waterproof cap or within a secured facility <br /> e. Thick enough to withstand anticipated stresses <br /> f. Construction materials: <br /> 1 ) Are not weakened by stored product <br /> 2) Will not donate, capture, or mask constituents to be analyzed. <br /> 9. Membrane liner specifications. <br /> A. Refer and comply with Article 3, Section 2631 j , k, 1 , and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.