My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
INSTALL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:36 AM
Creation date
11/2/2018 6:14:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\1994 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.Secondary container othern double -walled tanks (includes intercepts• <br />and detection systems), t action 2633 (f)] <br />A. Backfill in secondary container. [Section 2635 (c) 1-81 <br />B. Pore space of granular material used as backfill for primary container(s) complies with Section 2631 <br />(9). [Engineering data to support capacity requirement). <br />C. Two or more primary containers within secondary container. (include information on product <br />compatibility) <br />D. Secondary container capable of precluding highest anticipated groundwater. <br />E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br />and removed. <br />F. Nater tight corner which extends at least a foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />20. Secondary container(s) thickness, density, coipositi on, product compatibility. <br />✓ Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br />[Section 2631 (c)] <br />21. <br />22. k <br />23. <br />Secondary container(s) volumetric requirements: (Section 2631 (e) (1) <br />and (2)] <br />-- A. Single primary containers = 100%. <br />B. Multiple primary containers = 150% of largest primary container or 10% above aggregate. <br />Secondary container(s) open to rainfall. [ Section 2631 (f)] <br />Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br />Secondary container floor. [Section 2631 (])] <br />A. Constructed on firm base. <br />B. Sloped to collection sump ( 1/8 inch per foot). <br />(1) One or more access casings installed in sump. <br />(a) Size to allow removal of collected Liquid. <br />(b) Extended to grovel surface. <br />(c) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donate, <br />capture, or mask constituents to be monitored. <br />Membrane liner specifications. [Section 2631; k, 1, and m] <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.