My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
4025
>
2300 - Underground Storage Tank Program
>
PR0231068
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 6:16:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0231068
PE
2381
FACILITY_ID
FA0003806
FACILITY_NAME
J.H. SIMPSON CO., INC
STREET_NUMBER
4025
STREET_NAME
CORONADO
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11530025
CURRENT_STATUS
02
SITE_LOCATION
4025 CORONADO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\4025\PR0231068\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> Tank(s) and fine(s) will first he triple-rinsed and pumped out. Next, the <br /> appropriate amount of dry ice (15 lbs. per 1,000 gal. cap. diesel and 30 Ila& <br /> gasoline) will be added to the lank(s) and then monitored with an LEL meter. <br /> b. Tank Pipe Ilauler• Jim Thortic Oil Co., Inc <br /> Address: 351 N. Beckman Road / P.O. Box 357City: Lodi, CA Zip: 95341-0357 <br /> Phone No. (916) 462-4581 <br /> Ilauler Registration k(If hauled as hazardous): 2667 <br /> C. Tank/Piping Disposal Site: <br /> Name: Schnitzer Steel Producls <br /> Address: 1241111111 Folsom Boole '4l_Pity: _Itmrc l ii ordovq_ zip: _95712_ <br /> Phone No. (916) 985-4810 <br /> EPA ID#: (if transported to a permitted TSD facility): <br /> 9. Describe, in detail, how the soil anul/or water sample(s)beneath the lank and piping will be obtained: <br /> After tank removal we will excavate 2 (o 3 feet under the former tank location into <br /> native soil at the appropriate locations with the backhoe at the direction of the EI1D <br /> representative oil site. Samples will be taken from the backhoe bucket. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Backfill of the excavation will be completed at the appropriate time during this project. <br /> i; <br /> A determination of the most cost-effective method will be made and undertaken. Fill <br /> material will be what is the most cost-effective for the final desired condition. <br /> It. Handling of excavated soil: i <br /> a) What material will be used to line the lank pit and cover the stockpile7 <br /> 6 mil thick plastic sheeting <br /> b) What will be the final destination of the excavated stockpile? . <br /> A de(ennination will be made at the appropriate time. <br /> c) Contaminated Soil I lazardous Waste Hauler. �I <br /> Names: Dillard Trucking Hauler Registration N: 1745 <br /> Address: 3291 Byers Road / Rt. 1 Bx 73 City: Byron, CA Zip: 94514 <br /> Phone No. (415) 634-6850 <br /> Pepe 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.