My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
4025
>
2300 - Underground Storage Tank Program
>
PR0231068
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 6:16:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0231068
PE
2381
FACILITY_ID
FA0003806
FACILITY_NAME
J.H. SIMPSON CO., INC
STREET_NUMBER
4025
STREET_NAME
CORONADO
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11530025
CURRENT_STATUS
02
SITE_LOCATION
4025 CORONADO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\4025\PR0231068\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 4025 Coronado Avenue, Stockton, CA 95204 <br /> J.H. Simpson Company Phone No. (209)466-1477 <br /> Owner <br /> Contractor JIM THORPE OIL. INC._ Phone No. (209)368-6175 License N0.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> X 2. Submission of verification, e.Q., load ticket, within 30 days of project completion that one of the following materials <br /> was placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(I/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I berchy certify that a Soil Engineer's Compaction Report will be submitted within 30 daysof roject completion,or submission <br /> of verification that the select material described above will be placed at a minimum of fiv (5�cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> • JIM THORPE OIL,INC. <br /> ame nnt) <br /> ' CONT "'0 <br /> It <br /> igr e <br /> ' Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.