Laserfiche WebLink
- 2 - <br />6. Tanks to be triple rinsed and pumped dry. <br />All residuals to be transported to: <br />Chevron Asphalt Plant in Oakland <br />To be pumped and transported by: <br />Erickson Inc. <br />255 Parr Road <br />Richmond, CA 94801 <br />415-235-1393 <br />7. Tanks to be pumped out per above and dry ice will be inserted <br />to purge flammable vapors: <br />Tank <br />Al - <br />30 <br />lbs. <br />dry <br />ice <br />Tank <br />#2 <br />- 60 <br />lbs. <br />dry <br />ice <br />Tank <br />#3 <br />- 60 <br />lbs. <br />dry <br />ice <br />Tank <br />#4 <br />- 45 <br />lbs. <br />dry <br />ice <br />Tank <br />#5 <br />- 45 <br />lbs. <br />dry <br />ice <br />Tank <br />#6 <br />- 10 <br />lbs. <br />dry <br />ice <br />8. Tanks to be transported to Contractors San Andreas yard <br />for disposal. <br />