Laserfiche WebLink
2 <br />I OCKING ACCESS BOX <br />RISER VENT <br />F� <br />11IM\011-D PVC, OR At-I'l <br />"CHLU B0 1101L WlIft <br />3/4" RIGID CONDUIT II#kEADED CAP <br />W/EXPLOSION PROOFLIQUID LEVEL SENSOR, <br />JUNCTION F30X ell, SEE MONITOR <br />INSTALLATION DWGS, <br />4" Slffl_ NPT FITTING <br />COATED 4"d1 FRP RESIN WATER OR <br />BY FACTORY -HRINE SURFACE <br />11 <br />00 <br />FRP TANK WTI1 INTEGRAL R-25 <br />FRP RESERVOIR <br />RESERVOIR MONITOR <br />LID OPENS AWAY FROM mviwAr4 itm rivor- LOCKING ACCESS BOX <br />FILL STAGE I VR (NOT TOWARDS) TRUCK, MOUNTING FITTING <br />4" CAP ON RONAN—_ <br />BRASS ADAPTER EXPLOSION —PROOF <br />EXPLOSION—PROOF J__Box <br />TLM J—BOX — <br />z <br />w >_ _:;c w SEAL OFF 3/4"' CONDUIT TO <br />ZI < Z uj <br />CK z �g 0� u0j 3/4" C, TO TLM SENSERS MANHOLE SUMP J—BOX <br />Li ;i z .4 BOOT W/ STAINLESS WORM <br />LAJ <br />cr, 3/4' CONDUIT TO TURBINE CLAMPS (NO AIR STEM), <br />w 0 ui F- NONAN CONTROLLER <br />0 < z <br />cy <br />T Fn �_ x N <br />Z, 3/4" CONDUIT TO TURBINE <br />3'-0" MIN., St L z UJ Z z x z SUMP MONITOR ♦ RONAN TRANSDUCER <br />uj 6 <br />0 <br />jS Ld _J <br />SITE PLAN FOR I U- (y :2 V) t-- V) I (n 0- N1" CONI)t HT TO DOUBLE <br />TANK SIZE'. DOUBLE CONTAINMENT SENSOR <br />FIBERGLASS COLLAR 4" GALV. RISER <br />FRP K— L-ni E, <br />R <br />�1 <br />PIPE <br />_7 <br />DOUBLEWALL FRP TANK — TIAREADEE) CONTAINMENT <br />PIPE <br />Z PEA GR <br />DACKF <br />BOTTOM OF <br />TANK 110[..E <br />EXCAVATION <br />THI`' 'ADED <br />PVC CAP <br />CONCRETE KNOCK—OUT <br />7 1 <br />r <br />2 <br />10" SCH 40 PVC MONITOR <br />FORT WITH CONTINUOUS <br />0,02" MACHINED SLOTS <br />(ANO TfiREADED CONNECTIONS <br />GI OED JOINTS) <br />4% 2" SCORED JOINT <br />)" EXPANSION JOINT <br />DOWELS 0 8" O'c, <br />BORING SLEEVE <br />4 <br />I <br />I <br />I <br />8 <br />0 <br />11 <br />IAI <br />FRP SUMP " I <br />FLEXIBLE EUI <br />STAINLESS S <br />HOLE IN <br />SUMP WALL <br />FIELD LOCAT <br />AND DRILL, <br />m <br />IN <br />PIPM, SUMP <br />1" MIN. ACCESS BOX <br />CLEAR <br />- armw <br />2 LAYERS OF 1" RIGID FOAM <br />Tu 0 m <br />PADDING W/2" DRAINAGF <br />_-1� IN 4,4 <br />SLOTS 1N E.�ol lom <br />ny 12' Rism <br />FIELD DOND[D JOIN I- (IYI),) <br />V) <br />----JT--H2 LINE PRESSURE <br />SENSOR (IF RF_00IRF­D BY <br />)mwPW 11011) <br />Lr) (n <br />N L <br />N <br />j <br />2" FLEX <br />CONNECTOR <br />DOL- WALL <br />TANK <br />GALV NIPPLE <br />CkIECK VALVE <br />3/4- C. TO SUMP GALV NIPPLE <br />MONITORING UNION <br />--------- CONDUIT W/ TC1 SUMP RONAN LS -3 LIQUID SENSOR <br />PENETRATION FITTING (TYP) MOUNTED 1" ABOVE TANK IN <br />3/4- C. TO WIREWAY LOWEST POINT OF SUMP <br />INSIDE 2"o PVC PIPE <br />SECURED TO THE SIDE WALL <br />OF PIPING SUMP, <br />BALL FLOAT VALVE <br />/'-6" FROM BOTTOM <br />OF TANK (INSIDE) <br />SUMP RISER (TYP OF 2) <br />FRP SUMP WALL <br />/—DULKHEAD FITTING <br />FLEXIBLE BOOT (OR EQUAL) FIELD LOCATE <br />W/ AIR TEST STEM, AFTER TESTING <br />SLIDE BOOT BACK TO CLEAR <br />CL E E7A <br />XI 8L B 00 T ( 0 R �O U <br />AIR EST TE AF I E <br />STEM, <br />C! <br />OT C <br />DE 0 0 DA K <br />SECONDARY <br />R Y C 0 T M FIBERGLASS SECONDARY <br />SECONDARY CONTAINMENT,— <br />CONTAINMENT PIPE <br />2' FRP PRODUCT PIPE <br />Z.7...a <br />FIELD BOND (W/ADIAESIVE FROM <br />TANK MFR) PIPING SUMP------- <br />+ <br />TO 'TANK COLLAR-_,-, <br />TM <br />in <br />NPT INTERSTICE ACCESS FITTING <br />WITH BRASS PLUG, <br />PIPE THRU s"'UMP <br />VENT AND VAPOR <br />PIPING PENETRATION <br />13 <br />14 <br />a <br />Ki <br />"'i <br />m <br />r <br />SHEET <br />Zi <br />17 <br />(F)ISJIM N1 UWANY, All PICHTr, RFrf'RWD <br />C_1 <br />F3 <br />4050 <br />4075 <br />000 <br />4125 <br />4200 <br />4300 <br />4309 <br />VENT AND VAPOR <br />PIPING PENETRATION <br />13 <br />14 <br />a <br />Ki <br />"'i <br />m <br />r <br />SHEET <br />Zi <br />17 <br />(F)ISJIM N1 UWANY, All PICHTr, RFrf'RWD <br />C_1 <br />F3 <br />