My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:37 AM
Creation date
11/2/2018 6:27:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\INSTALL PLAN 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERFORMANCE SPECIFICATION - CONTINUED <br />SECTION IX CANOPIES - CONTINUED <br />PART 3 - EXECUTION -CONTINUED <br />3 I I <br />FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE <br />A MINIMUM OF 4 'WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK <br />SHAL..L. COMMENCE PRIOR TO APPROVAL OF DRAWINGS BY SOUTHLAND'S CONSTRUCTION <br />.r <br />REPRESENTATIVE <br />3 2 EXECUTION <br />x <br />3.2 1 <br />COORDINATE DELIVERY AND INSTALLATION WITH GENERAL GASOLINE INSTALLER <br />THROUGH LOCAL CONSTRUCTION OFFICE MATERIALS SHALL BE STORED AT POSITION AS <br />INDICATED BY GENERAL GASOLINE INSTALLER. <br />3.2 2 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR <br />BOLTS AND TEMPLATE FOR DELIVERY TO GENERAL GASOLINE INSTALLATION CONTRACTOR <br />2 WEEKS PRIOR TO INSTALLATION. SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN <br />zX. <br />ACCORDANCE WITH GASOLINE INSTALLING CONTRACTOR'S SCHEDULE OF CONSTRCUTION. <br />3.2..5 <br />FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY <br />GENERAL GASOLINE INSTALLER AS PER APPROVED SHOP DRAWINGS, TYPE OF CONCRETE <br />SHALL HE AS PER SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED <br />STEEL SHALL BE AS PER SHOP DRAWINGS. <br />3.2 4 <br />THE CONTRACTOR SHALL. VERITY ALL DIMENSIONS BEFORE STARTING WORK AND <br />NOTIFY SOUTHLAND'S CONSTRUCTION REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES <br />FOUND. REFER TO SITE PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY. <br />3,2 5 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN <br />LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED, A <br />COPY OF THE PERMIT MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR <br />TO COMMENCING 'WORK. <br />3-2.6 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE <br />4 <br />2 V <br />WITH ACCEPTABLE INSURANCE AS REQUIRED PER SOUTHLAND CORPORATION INSURANCE <br />SPECIFICATIONS AND STANDARD CONTRACT FOR CONSTRUCTION INSURANCE SHALL BE <br />IN EFFECT FOR DURATION OF WORK. <br />3.2.J <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL 'WORK OF <br />OTHER CONT'RAC'TORS ALREADY IN PLACE, AS MAY BE REQUIRED. <br />3.2.8 <br />CANOPY CONTRACTOR SHALL, BE RESPONSIBLE FOR CONTACTING AND OBTAINING <br />4K <br />7 <br />APPROVAL OF GENERAL GASOLINE CONTRACTOR PRIOR TO PLACING OF ANY HEAVY <br />EQUIPMENT ON TOP OF CONCRETE 'WORK ALREADY IN PLACE. <br />3.2.9 <br />ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED <br />w <br />a <br />TO 95'% MAXIMUM DENSITY BASED ON A. S.T M. D 1557-70. IF ANY POOR SOIL <br />CONDITION IS DISCOVERED DURING EXCAVATION, THE DESIGN ENGINEER SHALL BE <br />5 <br />NOTIFIED IMMEDIATELY FOR SOIL BEARING VERIFICATION <br />3.2.10 <br />SUPPORTING COLUMNS SHALL BE PLACED AS PER SOUTHLAND GASOLINE PLANS AND <br />AS PER APPLICABLE SITE PLAN. <br />3.2.11 <br />CANOPY' SUPPORT COLUMNS SHALL BE CAPPED AT TOP. <br />3.2 12 <br />ALL MATERIALS SHALL BE ALIGNED TRIOE AND FLAT AND ALL. PLANES SHALL BE <br />FLAT, TRUE TO ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL <br />WALLS CORRECT AND ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB. <br />ALL INTERSECTIONS SHALL BE TRUE AND STRAIGHTEDGE LINES, MATERIALS SHALL BE <br />LEFT IN ACCEPTABLE CONDITION TO BE PAINTED BY OTHERS. ALL METAL SHALL BE <br />FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL PAINTING/FINISHING. <br />3.2 13 <br />INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR POURING OF CONCRETE <br />AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE REQUIRED. <br />3.2.14 <br />CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF <br />DEBRIS, PRIMED AND READY FOR FINAL PAINTING BY GASOLINE CONTRACTOR. <br />3..5 RESPONSIBILITIES <br />OF GENERAL GASOLINE CONTRACTOR. <br />3.3 .1 <br />SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN <br />SITE WILL BE READY FOR INSTALLATION OF GASOLINE CANOPY. <br />3.3 ,2 <br />UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY CONTRACTOR, <br />THE SITE SHALL BE FREE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND <br />IN PROPER CONDITION FOR CANOPY INSTALLATION. GENERAL GASOLINE CONTRACTOR <br />SHALL. PERFORM SITE WORK AS MAY BE REQUIRED TO COMPLY. <br />3. 5_3 <br />GASOLINE CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY <br />ERECTION, UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY INSTALLER AND <br />GASOLINE INSTALLER. <br />5..34 <br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY <br />FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, <br />PROVIDING ALL STEEL_, ETC., (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE <br />PROVIDED BY CANOPY INSTALLER). FOOTINGS SHALL BE POURED IN A SUFFICIENT <br />AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED <br />3.3.5 <br />GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND <br />a <br />TRIM AS RELATED TO THE GASOLINE CANOOPY AS PER STANDARD COLOR REOUIREMENTS. <br />3.3 .6 <br />GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION <br />OF LIGHTS, SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL <br />GASOLINE INSTALLATION <br />3.3 7 <br />GASOLINE CONTRACTOR SHALT. BE RESPONSIBLE FOR LEAVING BLOCKOUTS AS MAY <br />BY REQUIRED FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS, <br />AND PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED <br />THERETO, <br />54 WARRANTIES: <br />CANOPY CONTRACTOR SHALL WARRANTY, IN WRITING, COMPLETE CANOPY <br />INSTALLATION FOR A MINIMUM PERIOD OF 2 YEARS, A 5 YEAR WARRANTY <br />GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATOIN DEFECTS. <br />INCLUDINGS <br />ACTS OF MAN, GOD AND NORMAL 'NEAR AND TEAR, SHALL BE COVERED. <br />,35 CLEAN-UP. <br />CANOPY CONTRACTOR SHALL BF RESPONSIBLE FOR CLEAN-UP AND <br />REMOVAL FROM SITE ALL TRASH AND DEBRIS RESULTING FROM WORK RELATING TO <br />INSTALLATION OF CANOPY, <br />071 <br />7 <br />ao p <br />.r <br />a <br />v <br />� <br />x <br />uQi <br />zX. <br />WY <br />V) <br />Z <br />O <br />e= <br />Q <br />V <br />C) <br />w <br />a <br />N <br />IL <br />Y6 <br />,aRC � <br />n <br />4 <br />2 V <br />a <br />O <br />h Ll N <br />} <br />d � m <br />m ¢ <br />O <br />J V w <br />V <br />4K <br />7 <br />z <br />0 <br />O O <br />i <br />Y <br />w <br />J <br />O <br />I n C) <br />r N 1n <br />w <br />a <br />5 <br />Z <br />a <br />n <br />U <br />DATE: 15JUL97 <br />PROJECT NO, <br />3027.20 <br />DRAWN: MSP <br />APPROVED: CI <br />DRAWING <br />FSP®5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.