Laserfiche WebLink
� s <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—(Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Check au <br /> that <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING MET HODS) <br /> ® L CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 4B 5s <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 4W54a. <br /> LEAK MONfrOR MANUFACTURER:Veeder-Reot °sass. MODEL*-.TLS-$SO 490.%� <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 151. MODEL#(S):794380-209 +vase. <br /> DET'ECT'ION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO °9x59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO asaeo. <br /> FAILURFIDLSCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 4vasn. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT ATTHE DISPENSER I@ L YES ❑ h No ' <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2.DOUBLE WALL <br /> IF DOUBI.FWALL: asassa <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ Is.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO d90."a <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED °sass. <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.I' ccx ssdu_i <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> ® 3.SPILL BUCKET'S ARE TESTED ANNUALLY. °9�T <br /> VIII. RECORD KEEPING <br /> The following rnonitoringlmaintennce secads are kept far this facility: aid. <br /> N a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SBR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation roads) <br /> ® E ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities ase familiar with all of the following documents relevant to their job duties: 4sasa. <br /> REFERENCE DOCUMENT'S MAINTAINED AT FACILITY(Check all that apply) <br /> I@ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) sorsa. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) Ssasx. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49 . <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICA11ON:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" rafasa. <br /> 4vassn. <br /> ❑ 077TER(Specify): 490,sw. <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council 4sa70. <br /> (ICC). The "Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of him.This training will include,but is nor limited to,the following: <br /> ➢ Operation of the UST systems in a manna consistent with the facility's bat management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> Y The facility employee's rale with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Y Name(s)of contact penoo(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures as attached to this plan. asoti. <br /> Ovarf111protection-Rapper <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible far ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST Ink detection equipment coverad <br /> by this plan occurs;2.)a6 conditions&at indicate a possible release are investigated;and 3.)all monitoring records ate maintained <br /> THE FOLLOWING PERSONS)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Ian Moorhead 190.12, TTTLE:Environmental Compliance Manager <br /> NAME: Jivtesh Gill aW74 TITLE:Franchisee 49 71. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operxmr of any <br /> conditions that need folio.-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledgIc <br /> APPLICANT SIGNATURE DATE: a90''^. <br /> REPRF56 GI.Tva Owner a 3.Fxile Owns wr ).Na r¢m a urOwm 390.75. 0-`t Z <br /> APPLICANT NAME(print): 49 78. APPLICANTTTnE: 4voro. <br /> Ian Moorhead Env. Compliance Mgr. <br /> UPCF UST.D(12/2007)•3/4 www.unidomorg <br />