Laserfiche WebLink
SWRCB,January 2002 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard X� Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used; 0 Pressure ❑ Vacuum X Hydrostatic <br /> E] Other (Spec) <br /> Test Equipment Used: vp1t Equipment Resolution: inches <br /> Sump# 2 REG Sump# 1 PRE Sump# Sump# <br /> LSump Diameter: 4 2" 4 2" <br /> Sump Depth: 5 0"' S 0 IF <br /> Sump Material: hrid e hpde <br /> Height from Tank Top to Top of 161, g„ <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 3„ 3„ <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 18 <br /> Does turbine shut down when <br /> sump sensor detects liquid{both IIYes ENo[]N [flYes[:]No❑N ❑Yes[:]Nc>❑N Yes®No[]N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system progeanuned for fail-safe ❑ oD ❑ � ❑ ❑ ❑ <br /> shutdown?* Yes N N X Yes N N Yes N� NA Yes No <br /> Was fail-safe verified to be ❑ ❑ � [:] ❑ ❑ � � �T <br /> operational?* X Yes N N Ycs N N Yes N N Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 10:17 10:2 4 <br /> Initial Reading(RI): 0 0 <br /> Test End Time: 10:47 10:54 <br /> Final Reading(RF): -.00081, -.0010'" <br /> Test Duration: 30min 30min <br /> Change in Reading(RF-RI ): -.0008" -.0010'" <br /> Pass/Fail Tlireshold or Criteria: +-. 00211 +-.00211 <br /> Test Result; Pass1:1 Fail PassF__ 1 Ll Fail Fass Fail Pass Fail <br /> Was sensor removed for testing? EYesE]NoEN �YesENo�N �Yes,�Ncr�NA Yes 11NoUN <br /> Was sensor properly replaced and r v y � ❑ ❑ F <br /> verified functional after testing? IflYe N JNA Ye N NA Ye N NA Yes Nc NA <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to-any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />