Laserfiche WebLink
INDIVIDUA TANK INFORMATION AND ST RESULTS <br /> .j r TankrK*)gy <br /> 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2265105 <br /> TEST DATE: 04/02/09 AUSTIN,TEXAS 78759(512)451-6334 <br /> SITE: 7-ELEVEN #14117, MKT 2368 <br /> CLIENT: 7-ELEVEN, INC. <br /> TANK INFORMATION <br /> 2 Tank manifolded: NO Bottom to top fill in inches: <br /> 128.2 <br /> Tank ID: <br /> Bottom to grade in inches: 1 <br /> Product: REG UNLEAD Vent manifolded: YES 33.2 <br /> Capacity in gallons: 10,028 Vapor recovery manifolded: YES Fill pipe length in inches: 4.0 <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: DUAL <br /> Length in inches: 329 Overspill protection: YES Stage I vapor recovery: <br /> or recovery: ASSIST 11 vapor Material: nw STEEL Installed: ATG Stage p <br /> CP installed on: <br /> COMMENTS <br /> TANK TESTRESULTS' z �?:` eStMethod ` <br /> �. LEAK DETECTOR TEST.RESULTS ; `4 st:method�� � ` <br /> PSI at tank bottom: Newipassed Failed/replaced Newlpassed Failedlrepiaced <br /> L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Fluid level in inches: <br /> UFTIOFT: Make: VAPORLESS <br /> Fluid volume in gallons: Model: LD2000 <br /> Tank water level in inches: SIN: oaoiisss <br /> Test time: NOT Open time in sec: 5.00 <br /> Number of thermistors: Holding psi: 28 NOT <br /> TESTED TESTED <br /> Specific gravity: Resiliency cc: 305 <br /> Water table depth in inches: est leak rate MUM 189.0 <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTest Method: LINE TEST RESULTS Test`type: <br /> Test time-. Material: CEO FLEX <br /> Ullage volume: Diameter(in): 2.0 <br /> Length (ft): 60.0 <br /> Ullage pressure: Test psi: <br /> Results: Bleedback cc: <br /> Test time(min): <br /> DATA FOR UTS-4T ONLY: Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2: Start time: <br /> Flow rate (cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate (cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 04110/2009 09:08 ACRAMER <br />