Laserfiche WebLink
itoring System Certification <br /> Sitia Address 2725 COUNTRY CLUB BLVD Date of Testing]Service:4102/2009 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 327.04 <br /> Complete the following checklist: <br /> Yestm <br /> No' Is the audible alarm operational? <br /> Q Yes No' Is the visual alarm operational? <br /> YesNo' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment MI not <br /> 0 Yes O No" interfere with their proper operation? <br /> Yes E]No' X N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g. modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> M Yes E]No' ❑NIA monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) p Sump/Trench Sensors; ❑X Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks Bad sensor failureldisconnection? ❑X Yes ❑No <br /> Yes No" NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> El overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> Yes" Q No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> 1-1 manufacturer name and model for all replacement parts in Section E,below. <br /> Yes* E No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> 1E Yes F—]No' Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> ❑ Yes ®No' Is all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA form dated 03101 <br />