Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory control. <br /> r Check this box If no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment Is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> r yes f No* Has all Input wiring been Inspected for proper entry and termination,Including testing for ground faults? <br /> r Yes r No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> r Yes r No* Was accuracy of system product level readings tested? <br /> IT* Yes r No* Was accuracy of system water level readings tested? <br /> r Yes r No* Were all probes reinstalled properly? <br /> P Yes r No* Were all Items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> r Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> r N/A apply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; f�0.2 g.p.h. <br /> r Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> r Yes f No* Was the testing apparatus properly calibrated? <br /> r Yes r No* For mechanical LLDs,does the LLD restrict product flow If it detects a leak? <br /> r" N/A <br /> * yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r N/A <br /> f Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> r N/A <br /> f Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> r N/A <br /> r' Yes r" No* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> r N/A <br /> r Ves r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />