Laserfiche WebLink
Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps r <br /> Fill Riser Containment Sumps are Present, but were Not Tested r <br /> Test Method Developed By: r Spill Bucket Manufacturerr Industry Standard IT Professional Engineer <br /> r Other (Specify): <br /> Test Method Used By: r Pressure r Vacuum r Hydrostatic <br /> r Other (Specify): <br /> Test Equipment Used: LAKE TESTI, Equipment Resolution: 56-062S n.] <br /> Spill Box At Spill Box # <br /> Tank T1 UNLEADED Tank 2 PREMIUM Spill Box # Spill Box # <br /> Fill - Direct Fill - Direct <br /> Bucket Diameter: 14.00 14.00 <br /> Bucket Depth: 12.00 12.00 <br /> Walt time between applying <br /> pressure/vacuum/water and 5 min 5 min min min <br /> starting test <br /> Test start Time: 09:20:00 09:20:00 <br /> Initial Reading rsc 12.00 in. 12.00 In. <br /> Test End Time: 10:20:00 10:20:00 <br /> Final Reading no: 12.00 In. 12.00 in. <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading m, in 0.00 In. 0.00 In. <br /> Pass/Fall Threshold or Criteria: +/- 0.00 +/- 0.00 <br /> Test Result: Pass Pass <br /> Comments? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> W0: 2302041 <br />