Laserfiche WebLink
*Monitoring System Certification <br /> Site Address: 2725 COUNTRY CLUB BLVD Date of TestinglService: 0411$1200$ <br /> F. In-Tank Gauging I SIR Equipment ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No' Was accuracy of system product level readings tested? <br /> []Yes ❑No* Was accuracy of system water level readings tested? <br /> Yes ❑No* Were all probes reinstalled properly? <br /> 0-1 Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No* ❑NIA Check all that apply)Simulated leak rate: L'J 3 g.p.h❑0.1 g.p.h E]0.2 g.p.h <br /> MX Yes ❑No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑NoWas the testing apparatus properly calibrated? <br /> 0 Yes ❑No* ❑NIA For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No" 0 NIA For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No* ®NIA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No" Q NIA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ` 0 NIA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ❑No <br /> LJ Yes �[]No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based an CA form dated 03101 <br />