Laserfiche WebLink
dILMED PROGRAM CONSOLIDATED F <br /> MRW UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN E 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Onl v) L <br /> BUSINESS NAME(Saw as Facility Name or DBA) 7-Eleven # 14117 3 <br /> BUSINESS SITE ADDRESS 2725 Country Club Dr 103. 1 CITY Stockton IN. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes, line leak detectors,etc.)must be performed at the frequency specified <br /> by[he equipment manufacturers'instructions,or annually,whichever is.more frequent.Such work must beFerfotmed by qualified personnel [D CCR§263+ 2634,? 8,2_6_2,11 _ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY <br /> ❑ 99.OTHER(Specify): 4%36. <br /> III. MONITORING LOCATIONS <br /> ❑ L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN E 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED (23CCR§2632,2634[ 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) c'ec'(B) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 4911-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632.26341 <br /> SECONDARY CONTAINMENT IS: E a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350 4Y0'8' <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL#(S): 794390-420 490-10. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(SI. 23 ccR-162,71 ascii. <br /> PANEL MANUFACTURER: 49x12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 b ❑ b 02 h ❑ c OTHER(S S 490-18. <br /> -___.............................____..__..__...-._..-.........._'_____....g:P•_.c :--__g:P..:_- _:...___...-_.-.-._ p ._Y�i 49 19. <br /> ..-...._..-___....- <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION R3 cca--6-6.11 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR--62,51 TESTING PERIOD: ❑ a.36 HOURS ❑ 6 60 HOURS 4'. <br /> _... -_.-___... _________ _________ ..______. 49x22 <br /> ® 5.TANK INTEGRITY TESTING PER 127 CCR-1647.0 -.-.-. .....-...� 49o-M.- <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY E c.OTHER(Specify) SB989 eve 36 months 490-M. <br /> -....-.-.-. .... _..... .....__----------------------------------- every a9xzs. <br /> 49x26. <br /> 99.OTHER(Specify): Overtill-Flapper 4W-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) r( B <br /> that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 49x28. <br /> §26 6R SECONDARY CONTAINMENT IS: E a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 49x31 MODEL#(S): 794350-352 49x73. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. E a.YES ❑ b.NO 49034. <br /> FAILURFJDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 490'35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK.11 TESTS AND RESTRICTS OR 1.SHUTS OFF 49x36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26361 <br /> ------------------ <br /> MLLD MANUFACTURER(S):VaporleS3 & Red Jacket 49(1-32' MODEL#(S): LD2000 & FX1 V 49x38. <br /> -_. ------ <br /> .-.-.-._.- ...... ......._._....-- ..-.._.- <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3 0 g.p h.LEAK TESTS [3 CCR§26361 490-39' <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1gP h. 490-41. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> E 4.PIPE INTEGRITY TESTING. a9a4s. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b,EVERY 3 YEARS E c.OTFIER(Specify) SB989 every 36 mo. 49x46. <br /> __..__._..........................._.._.-....__-________._._..___ ___..__.._.._.......... <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. 490-49. <br /> __ •AlbwW for monttorin�of unbw_W eme�ency-genemtorfceiPlpin&oNyyer HSC,i3-8t5(b)(3)_____ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA f'3 CCR§2636(4)(3)1 49050. <br /> _.__.._ ----------------.. . .______. ___--------.._.-...._..... ...... ......___....._ ............._____- ._ ._.._. <br /> ❑ 7.NO REGULATED PB'ING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-5I. <br /> ____ ........._ <br /> ........................ <br /> ❑ 99.OTHER(Specify) .. ___ ........____.._ _.---_'-- <br /> 490 5?. <br /> 49x5J. <br /> UPCF UST-D(12/2007)-1/4 www.unidotmorg <br />