Laserfiche WebLink
Jab Safety Analysis [JSA] <br /> Aerial Lift Usage <br /> (cherry picker, bucket truck) <br /> STEP ACTIVITY HAZARDS RISK CONTROL MEASURE NOTES <br /> 4 Performing Task 1. Falls from lift,dropped items, 1. Fall restraint harness must be 1. Work shall not be conducted if <br /> From Boom Lift damage to tools or property worn at all times and tied off an employee cannot be <br /> under the lift. while in an aerial lift basket. reached and released from <br /> 2. Falling from lift. 2. Use tool belt or bucket to secure their fall protection within ten <br /> tools and raise the tools up to (10)minutes of a fall unless a <br /> 3. Dropping items from lift. where you're working. Rescue Plan is in place and <br /> 4. Falling from lift. approved by the QSE <br /> 3. Properly stow or place tools on Manager. <br /> tool belt before moving or <br /> switching tasks while on the lift. <br /> 4. Employees shall be tied-off at all <br /> times(when working over 6 feet) <br /> except when traversing to and <br /> from the work area. <br /> References: <br /> 1. OSHA standard 29CFR 1910 subpart D <br /> 2. OSHA standard 29CFR 1926.1053 <br /> 3. OSHA standard 29CFR 1926.453 <br /> 4. OSHA standard 29CFR 1926.500 <br /> 5. OSHA standard 29CFR 1926.501 <br /> 6. OSHA standard 29CFR 1926.104 <br /> 7. OSHA standard 29CFR 1926.451 <br /> 8. American Petroleum Institute(API)Recommended Practice 1646,Section 7(August 2006) <br /> 9. ANSI A 10.8-2001 "Safety Requirements for Scaffolding" <br /> Page 3 of 3 <br />