My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
REMOVAL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 6:48:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2013
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\REMOVAL 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jab Safety Analysis [JSA] <br /> Aerial Lift Usage <br /> (cherry picker, bucket truck) <br /> STEP ACTIVITY HAZARDS RISK CONTROL MEASURE NOTES <br /> 4 Performing Task 1. Falls from lift,dropped items, 1. Fall restraint harness must be 1. Work shall not be conducted if <br /> From Boom Lift damage to tools or property worn at all times and tied off an employee cannot be <br /> under the lift. while in an aerial lift basket. reached and released from <br /> 2. Falling from lift. 2. Use tool belt or bucket to secure their fall protection within ten <br /> tools and raise the tools up to (10)minutes of a fall unless a <br /> 3. Dropping items from lift. where you're working. Rescue Plan is in place and <br /> 4. Falling from lift. approved by the QSE <br /> 3. Properly stow or place tools on Manager. <br /> tool belt before moving or <br /> switching tasks while on the lift. <br /> 4. Employees shall be tied-off at all <br /> times(when working over 6 feet) <br /> except when traversing to and <br /> from the work area. <br /> References: <br /> 1. OSHA standard 29CFR 1910 subpart D <br /> 2. OSHA standard 29CFR 1926.1053 <br /> 3. OSHA standard 29CFR 1926.453 <br /> 4. OSHA standard 29CFR 1926.500 <br /> 5. OSHA standard 29CFR 1926.501 <br /> 6. OSHA standard 29CFR 1926.104 <br /> 7. OSHA standard 29CFR 1926.451 <br /> 8. American Petroleum Institute(API)Recommended Practice 1646,Section 7(August 2006) <br /> 9. ANSI A 10.8-2001 "Safety Requirements for Scaffolding" <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.