Laserfiche WebLink
loud, noisy machinery, ie saw <br /> 77 cutting blade or jackhammer(toe <br /> caps), wear long pants and steel <br /> toed leather shoes, ensure <br /> enough drinking water is available <br /> in effort to prevent dehydration. If <br /> needed, use sun block to protect <br /> from sunburn. <br /> 4 Survey work area Work at incorrect site or location, use Read construction permits and <br /> of inappropriate equipment, site construction drawings, verify <br /> rupture/break underground subsurface work/service order. <br /> structures, vehicle and pedestrian <br /> traffic, work performed in wron area. <br /> 5 Secure/barricade Vehicle and pedestrian customer Barricade by using delineators to <br /> work area with traffic in the work area. Potential back caution customers that work is <br /> fencing and caution strain and muscle pull from being done and it is not safe to <br /> tape lifting/setting barricades. Pinch points enter the work zone. In some <br /> to hands when setting up barricades. cases fencing may be required to <br /> Tripping while handling barricade insure proper safety. Use proper <br /> equipment and/or other equipment on lifting and bending techniques <br /> and around site, personal injury. when picking up barricading <br /> Inaccurate distance of barricaded area equipment from storage area. <br /> could result in injuries to passersby. Insure proper distance in the <br /> securing of work area. <br /> 6 Complete Self- Lack of complete awareness and Self-permit should be posted and <br /> Permit form focus of potential hazards. Explosion easily made available for <br /> due to LEL limits where work is inspection. <br /> erformed. <br /> 7 Inspect hand/power Faulty or dirty tools may cause injury Make sure hand tools are clean <br /> tools, Heavy to the user. Personal injury caused by and free of oil or debris. Insure <br /> Equipment using incorrect tool for job. Personal power tools are clean and all <br /> (Concrete Breaking, injury due to the poor condition of parts are secure including shields <br /> etc.) before starting heavy and concrete breaking and deflectors. <br /> work equipment. Back strain, eye, hand, Tech nicianslworkers have proper <br /> foot, injuries due to improper use of training and a combination of <br /> sledge hammer. certification and experience is <br /> using specific task oriented <br /> toollequipment. Insure heavy and <br /> concrete breaking equipment is in <br /> proper working order. <br /> 8 Start Cutting 1 Flying sparks or debris, dust, and Verify adequate barricading is in <br /> Breaking Concrete noise. Damage to property, <br /> place. Also verify if site requires <br /> pedestrians, customers, and workers to be closed or it is permissible to <br /> from concrete breaking equipment. commence while site is open. Re- <br /> Explosion due to high LEL limits verify all required PPE is being <br /> and/or fire(s). utilized immediately prior to the <br /> commencement of cutting <br /> concrete. Take LEL readings, use <br /> fire blankets and insure <br /> flammable spills are addressed <br /> before starting to break/cut <br /> concrete. Zero LEL required. Plan <br /> fors arks. <br /> 9 If Backhoe or Jack Personal in ur , crushed body arts, Establish communication with <br />