Laserfiche WebLink
Job Safety Analysis—(Fence Removal) <br />Field staff must review job -specific work plan and coordinate with project manager to verify that all up -front logistics <br />are completed prior to staging work including, but not limited to, permitting, success agreements and notification to <br />required contacts (e.g., site managers, inspectors, clients, subcontractors, etc.). Additionally, a tailgate safety meeting <br />must be performed and documented at the beginning of each work day. Safe Performance Self Assessment (SPSA) <br />procedures must be used during field activities. Also consider weather conditions (heat, cold, rain, and lightning). <br />Pprcnnal Prntect`ve Equipment (PPE), Level 0 <br />Hard Hat - - - <br />.� -. <br />Yes <br />❑ <br />No <br />Steel -toed Boots <br />E <br />Yes <br />❑ <br />No <br />Hearing Protection—specific to task <br />Always conduct an SPSA prior to <br />Yes <br />❑ <br />No <br />High Visibility Traffic Safety Vest <br />® <br />Yes_ <br />❑ <br />No <br />Protective Gloves—Leather work gloves <br />® <br />Yes <br />❑ <br />No <br />Safety Glasses & Screen Face Shield <br />productivity. <br />Yes <br />❑ <br />No <br />Other: <br />in your pocket. Follow the Entact <br />.� -. <br />.� MIMIMUM MMM. <br />KIRF M.. rim <br />71Conduct <br />Fence Removal <br />SPSA. <br />NLI/LI due to unreconized hazards. <br />Always conduct an SPSA prior to <br />starting a new task. Review OE <br />tenets and SWA. <br />2 <br />Perform daily <br />EQuipment damage, injury or loss of <br />LOITO during inspection. Remove <br />equipment <br />productivity. <br />the key from the ignition and put it <br />inspection_ <br />in your pocket. Follow the Entact <br />inspection form. Notify FPM of <br />any problems. <br />3 <br />Clean/defrost <br />Poor visibility resulting in <br />Use window cleaner and paper <br />windows and <br />injury,equipment or property damage. <br />towels. Clean only when <br />mirrors, adjusting as <br />equipment is off and the parking <br />needed. <br />brake is set. <br />4 <br />Entering equipment. <br />Slips/trips/falls, pinch points, personal <br />Always use 3 -point <br />injury. <br />mount/dismount, stay clear of <br />pinch points. Be aware of wet and <br />icy conditions. Use steps <br />provided. <br />5 <br />Configure controls <br />Ergonomic issues, poor visibility, <br />Adjust seat and controls while <br />and adjust seat. <br />inability to reach controls. <br />sitting, fasten seatbelt, check <br />parking brake is on and <br />transmission is in park. <br />6 <br />Excavator starting <br />Un -anticipated equipment monement, <br />Review operating manual and <br />and warm up. <br />engine fire, mechanical/electrical <br />JSA. Start engine and observe <br />faults. Failure to start. <br />gauges and indicators for proper <br />response. Allow for proper warm <br />u. <br />7 <br />Moving equipment to <br />Vehicle accidents, overhead utilities, <br />Review the haul routes and yield <br />the work area. <br />unevan terrain, wildlife in area. Dust <br />to truck traffic. Communicate your <br />eneration. <br />intentions when ap roachin <br />