My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
REMOVAL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 6:48:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2013
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\REMOVAL 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.�N FEW MTT M-1 rim <br />approved mounting steps, <br />brackets and handrails. Use <br />required PPE. Place in neutral, <br />set brake, wn ne <br />5 Configure controls <br />_and <br />Personal Injury. Equipment damage Adjust seat for reach and comfort. <br />and seating <br />Fasten seatbelt. Make certain all <br />controls are set in neutral <br />ositions. Keep bucket on ground. <br />6 Starting and <br />Equipment damage. Personal injury Review manual if new to <br />machine. Start engine and check <br />warming up. <br />all controls. Allow to warm up. <br />allow longer in cold weather <br />7 Moving equipment to <br />Personal injury. Equipment damage Conduct SPSA. Know the daily <br />work area <br />task and other people and <br />equipment in the area.Survey <br />path to identify obstructions and <br />overhead utilities. Use spotter for <br />backingu . <br />8 Performing tasks. <br />Equipment damage. Personal injury. Perform SPSA. Know where <br />Overhead utilities.©ust. Underground utilities are located. Contact <br />utilities Louisiana One Call at least 48 <br />hours prior to work. Understand <br />scope of work to be performed. <br />Know travel paths of other <br />equipment entering and leaving <br />your work area. Stop work <br />immediately and contact a <br />supervisor is you are uncertain of <br />your task. Use spotter when <br />digging around utilities or backing <br />up <br />. Keep bucket low to ground when <br />traveling. Keep rear bucket locked <br />when traveling. Be aware of <br />structures in area, and back boom <br />distance from them. Keep loaded <br />bucket down. No turns with <br />loaded bucket. Shut equipment <br />down immediately if any damage <br />to utilit lines is suspected. <br />9 Shutting down <br />Slips trips and falls. Fuel splash/ spill. Park in designated area. <br />operations at end of <br />Equipment damage. Personal injury Set brake/ control locks. <br />Lower bucket to ground. Use 3 - <br />day <br />point dismount. Grease moving <br />parts. Secure all equipment and <br />supplies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.