Laserfiche WebLink
Job Safety Ana lysis—(LockoutlTagout of an Electrical Panel or Subpanel) <br />Field staff must review job -specific work plan and coordinate with project manager to verify that all up -front logistics <br />are completed prior to staging work including, but not limited to, permitting, success agreements and notification to <br />required contacts (e.g., site managers, inspectors, clients, subcontractors, etc.). Additionally, a tailgate safety meeting <br />must be performed and documented at the beginning of each work day. Safe Performance Self Assessment (SPSA) <br />procedures must be used during held activities. Also consider weather conditions (heat, cold, rain, and lightning). <br />Date: <br />Work Type: Lockout/Ta out of an Electrical Panel or <br />Work Site: <br />Organization: Wayne Perry, Inc. <br />Dnrcnnnl Prntor_#IVP Fritiipment (PPE) <br />Hard Hat <br />® <br />Yes <br />❑ <br />No <br />Steel -toed Boots <br />M <br />Yes <br />❑ <br />No <br />Hearing Protection—specific to task <br />® <br />Yes <br />❑ <br />No <br />High Visibility Traffic Safety Vest <br />® <br />Yes <br />❑ <br />No <br />Protective Gloves—Leather work loves <br />employees <br />Yes <br />❑ <br />No <br />Safet Glasses &Screen Face Shield <br />In Yes <br />❑ <br />No <br />Other: <br />off) circuit breaker <br />line could cause serious <br />the system and equipment in a known stable <br />s1W0�w• <br />7E Lockout/Tagout <br />of an Electrical <br />Panel or Subpainel <br />Prepare panel or <br />Electrocution, fire, physical <br />Assess the task to identify hazards. Analyze <br />subpanel <br />damage. <br />hazards to determine how to eliminate or reduce <br />shutdown <br />them. Follow through with safe operating <br />rocedures. <br />Notify all affected <br />Contact with energized power <br />Let everyone in the area know what specific <br />employees <br />line could cause serious <br />equipment you will be locking out. <br />inju or death <br />Deactivate (flip <br />Contact with energized power <br />By conducting a normal shutdown you are placing <br />off) circuit breaker <br />line could cause serious <br />the system and equipment in a known stable <br />injury or death <br />condition. <br />Install Lockout <br />Locking the panel or <br />Prevent someone from accidentally energizing the <br />Devices & Tags <br />subpanel out too soon will <br />circuit by placing locks and tags on the circuit <br />prevent electrician from <br />breaker. <br />following proper procedures; <br />failing to lock out could result <br />in energy from generator, <br />capacitor, or other device to <br />back flow through the lines. <br />Release stored <br />Unaware of energy from <br />Ensure that energy is released in an approved <br />energy <br />source or residual energy still <br />manner. <br />in lines <br />