My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
REMOVAL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 6:48:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2013
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\REMOVAL 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Safety Analysis—(Pipe Handling) <br />Field staff must review job -specific work plan and coordinate with project manager to verify that all up -front logistics <br />are completed prior to staging work including, but not limited to, permitting, success agreements and notification to <br />required contacts (e.g., site managers, inspectors, clients, subcontractors, etc.). Additionally, a tailgate safety meeting <br />must be performed and documented at the beginning of each work day. Safe Performance Self Assessment (SPSA) <br />procedures must be used during field activities. Also consider weather conditions ;(heat, cold, rain, and lightning). <br />PnIlinmant 1PPE1. Level Gill <br />Yes <br />❑ <br />No <br />Hard Hat <br />is far the <br />Yes <br />❑ <br />No <br />Steel -toed Boots <br />Hearing Protection—specific to task <br />®Yes <br />Fiberglass piping <br />❑ <br />No <br />High Visibility Traffic Safety Vest <br />Yes <br />❑ <br />No <br />Protective Gloves—Leather work gloves <br />Self Assessment <br />Yes <br />❑ <br />No <br />Glasses & Screen Face Shield <br />change. <br />Yes <br />F-1No <br />Use buddy system to carry loads <br />of 50 lbs. or more or if they are <br />PSEafet <br />Personal injury. <br />too long for one person to handle. <br />ther: <br />obstacles; create a route to avoid <br />71JSA' <br />Pipe Handling <br />is far the <br />installation of PVC or <br />Fiberglass piping <br />and was created by <br />the subcontractor. <br />2 Safe Performance <br />NearLo Loss Incident. <br />Always perform an SPSA prior to <br />Self Assessment <br />starting a task or if conditions <br />change. <br />_3Carrying piping and <br />Slips, trips, falls. <br />Use buddy system to carry loads <br />of 50 lbs. or more or if they are <br />materials <br />Personal injury. <br />too long for one person to handle. <br />Make sure travel path is clear of <br />obstacles; create a route to avoid <br />obstacles. <br />4 Cut pipe to length <br />Personal injury from lacerations or <br />Keep hands clear from blade, use <br />using a hand saw. <br />flying debris. <br />proper body positioning when <br />cutting, wear safety glasses at all <br />times. <br />5 Assemble and glue <br />Inhalation hazards. <br />Use glue only in well ventilated <br />areas. Keep face from fumes. <br />piping together. <br />Chemical exposure. <br />Chemical release. <br />Wear latex gloves to prevent <br />exposure. Wear eye protection. <br />Keep lids for glue containers on <br />snug when not in use. Have <br />MSDS sheets available for glue. <br />Follow instructions for glue <br />applications. <br />JSA Form originated by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.