My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
REMOVAL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 6:48:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2013
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\REMOVAL 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c • <br /> ompleted prior to excavation. <br /> ontractor to perform daily tank <br /> LEL monitoring/add dry ice to <br /> keep LEL X10%. <br /> Ensure air monitoring in <br /> Slip/trip/fall accordance with agency and <br /> HASP requirements. <br /> Perform vapor suppression as <br /> Injury/property damage from required. <br /> loading/unloading Ensure vacuum equipment <br /> grounded to metal object buried in <br /> the ground. <br /> Ensure good housekeeping <br /> Runoff to right of way maintained. <br /> Avoid walking on uneven <br /> surfaces. <br /> Ensure area around truck/bin <br /> loading is clear of personnel. <br /> Use spotters to move trucks. <br /> Keep equipment/stockpiles clear <br /> of overhead structures. <br /> Ensure stockpiles are managed <br /> b HFA procedure. <br /> 7 Tank/lift removal Fall from excavation cave-in Keep at least 5 feet from edge of <br /> tank pit. <br /> Look for surface cracks or <br /> Explosion (see Job Step#6) undermining of asphalt/concrete. <br /> Ensure tank degassing/dry icing <br /> is conducted in accordance with <br /> agency requirements and obtain <br /> Slip/trip/fall instpector's/chemist's approval. <br /> Contractor to use approved fall <br /> protection system if working on <br /> Injury from overhead hazards tank top or disconnecting lines <br /> from tanks. <br /> Equipment must operate at least <br /> 10 feet from overhead lines. <br /> Inspect equipment/rigging prior to <br /> lifting objects. <br /> Keep clear of crane and lifted <br /> loads. <br /> Double lifting straps to be used on <br /> tanks. <br /> Injury by heavy equipment Ensure tanks are properly <br /> secured to truck by at least 3 <br /> straps. <br /> Use guide rope to stabiize UST. <br /> Public injury Gravel to be cleared off of <br /> removed UST. <br />
The URL can be used to link to this page
Your browser does not support the video tag.