My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
REMOVAL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 6:48:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2013
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\REMOVAL 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-Eleven lna —POM© <br /> BID FORM <br /> Underground Storage Tanks Removal .G <br /> Date,, <br /> Offeror's Company: G � _ <br /> Address: Phone#: <br /> City/State/Zip: Fax#: <br /> BID DUE DATEMME: r ,r <br /> Return Bid To: Stantec <br /> Address: 3017 Kil ore Road Suite 100 <br /> City/State/Zip Code: Rancho Cordova,CA 95670 <br /> Prosect Site Location# 7-11 #14117 <br /> Address: _2725 Country Club Blvd _ <br /> City/State/Zip Code: Stockton, CA 95204 <br /> Prosect Description <br /> The project will consist of the removal of two UST,9,piping,dispenser island,canopy, Healy vapor tank, <br /> and site restoration. Health and Safety Plan,supplied by Stantec, must be reviewed and signed. <br /> Contractor will assist Stantec personnel in collection of soil samples as required by the local regulatory <br /> agency for UST closure. Changes In scope of work due to unexpected site conditions must be <br /> communicated to Stantec project manager within 2 hours of discovery and a change order must be <br /> approved by Stantec print to commencement of the new work scope. The cost for scope changes will be <br /> In accordance with the rates shown in the section of this form titled UnitCosts forAdditionaf Scope. <br /> The information provided below is based on our current understanding of the existing UST system at the <br /> site and Is to serve as the basis for UST removal bids. <br /> Desired Start Date dune 17,2013 <br /> Tank Size/Quantity Two 10,000- al USTs and one He va or tank <br /> Tank Material <br /> Piping Materia{ Steel Double-wall <br /> Canopy(Remove, leave or none) Double-wall poly <br /> Islands)— 1 Remove <br /> AssumRemove <br /> ed Dimensions—See Figure Width (ft) Length(ft) Depth(ft) <br /> Tank Field 31 40 14 <br /> Product Line Trench 3 20 <br /> Canopy 4 <br /> 23 23 n/a <br /> Island(s) 23 23 <br /> 4 <br /> Version 2011 <br /> DF 4 <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.