Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FORMS <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54Obe <br /> 490- <br /> X 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> [14.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: Veeder Root TCS 350-R 490.55 MODEL#: 848290-012 490-56. <br /> LEAK SENSOR MANUFACTURER: Veeder Rant 45577M ODEL#(S): 794380-322 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 49059 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 490-60' <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a..YES ❑b.NO 49062 <br /> 2.UDC CONSTRUCTION IS X I.SINGLE-WALLED O 2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 49a64a- <br /> ___UDC INTERSTITIAL SPACE IS MONITORED BY_p l_LIQUID__❑2.PRESSURE 0 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ®a.YES ❑b NO 490-646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> _ <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MO_NTH_S AS_R_EQUIRED.L3 CCR2644.1) <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> —_----------- <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY. 49x67 <br /> VUL RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-689 <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 49o.68e <br /> ®ATG Testing results(and supporting documentation records).49 69f ❑ Corrosion Protection 60-day logs 490.68g <br /> ®Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490.69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-6k <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o.s9e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490s9f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> ig This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Overfill protection method—audio/visual alarm is set at 90%of tank capacity. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Aldo Basurto 49x72 TITLE Fuel Operations 49x73 <br /> NAME Stan Olea 490.74 TITLE Fuel Operations Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify th the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490.77 <br /> January 25,2010 <br /> NTIN n r/ r 0 2.Facility ner/ erator O 3 Authorized Re re entative of_Qyner <br /> APPLICANT NAME(print): r 49079 APPLICANT TITLE: 49079 <br /> Butch Hobson Safety and Environmental Affairs Manager <br /> nvra ncT_n 0 2/7nr71v4 <br />