My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1313
>
2300 - Underground Storage Tank Program
>
PR0231049
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/2/2018 7:03:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231049
PE
2381
FACILITY_ID
FA0003765
FACILITY_NAME
AIRPORT SHELL*
STREET_NUMBER
1313
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137007
CURRENT_STATUS
02
SITE_LOCATION
1313 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CHARTER\1313\PR0231049\COMPLIANCE INFO 1986 - 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•--6UG 11 1B9 17:21 R.H.L 1CRAMENTO 9166464679 P.2/2 <br /> \HAZMAT\MANULMON.ITR <br /> OVERFILL PROTECTION SYSTEM <br /> MANUAL MONITORING <br /> Written Filling Procedure: <br /> I. VISUAL MONITORING <br /> Prior to delivery of fuels, a visual monitoring of the <br /> level_ of the tank yo-•-kms g l-lee--ekal-1-be- <br /> performed. <br /> The station operator shall control the visual <br /> monitoring and filling of the tanks. <br /> II. AVAILABLE 'TANK CAPACITY <br /> The tank to be filled shall have an available capacity <br /> of 103% of the load to be dropped into it or the total <br /> load plus 200 gallon capacity, whichever is less, as <br /> determined by storage tank visual monitoring. <br /> III. METERED INPUT <br /> The load to be dropped into the underground tank shall <br /> _ be monitored either offsite by the batch plant into the <br /> truck or onsite via a meter on the truck into the <br /> underground tank. <br /> Signature: Operator <br /> Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.