Laserfiche WebLink
SITE PREPARATION AND SYSTEM DATA v _P�5` <br /> _,.� .,: <br /> - THREE-TANK SYSTEM OS3 <br /> CUSTOMER: l/ �� DATE: 7 �� <br /> i. <br /> LOCATION NO.: SYSTEM NO.: <br /> CITY/STATE: -- OC,(`C+». " PRODUCT: <br /> SITE PREPARATION <br /> OTHER CONDITIONS <br /> VAPOR RECOVERY ❑ PLUGS ❑ RISERS Q-OTHER <br /> VENT ❑ NO PREPARATION EhOPEN TO ATMOSPHERE ❑.P_V_.VALUE REMOVED ❑ OTHER <br /> 3REMOTE/SUBMERSIBLE (DEPTH 1 ❑ SUCTION (HEIGHT 1 <br /> CHECK VALVE ,,..--,, STRAINER �1rI�MPACT VALVE CHECK VALVE STRAINER SUCTION CONNECTION <br /> ❑REMOVED&OPEN LSREMOVEO LJPLUGED ❑BURIED ❑REMOVED ❑UNION <br /> r14 <br /> ❑SIN/PLACE ❑IN PLACE ❑CLOSED ❑EXTRACTABLE ❑ ❑ <br /> IN PLACE : COUPLING <br /> LJCLOSED ❑REMOVED& COVER ❑OPEN ❑REMOVED C-I REMOAV ED &COVER ❑OPEN WITH FOIL <br /> ❑RREMOVEEPLACED&COVER ❑OTHER ElIN PLACE ❑❑OTHER OPEN NO FOIL <br /> ❑CAP REPLA <br /> ❑OTHER CED ❑IN PLACE <br /> ❑OTHER ❑OTHER <br /> TEST 1 DATA <br /> TANK i ,TANK 2 TANK 3, <br /> LOCATION DROP TUBE LOCATION DROP TUBE LOCATION DROP TUBE <br /> FILL Gauge Other(SwIfy) IN OUT None FILL Gauge Other(SPlcify) IN OUT None FILL Gauge Other(Specify) IN OUT None <br /> T.PROBE <br /> BALANCE <br /> CALIBRATION <br /> LEVELS LOCATIONMETHOD <br /> ��/ �- SOLID ROD ❑ LIQUID <br /> Time Tank 1 Tank 2 Tank 3 2 3 4 5 6 AVERAGE <br /> M <br /> START /,/D 'j0 CC'S S <br /> END DIVISION <br /> AVG.CC'S/DIV. <br /> LEAK-RATE(LRI CALCULATION <br /> (, f� DIVISIONS CC = CC <br /> LR= X CALIBRATION, IN OUT <br /> ♦ AMINUTE D/IVISIO/N/ MINUTE <br /> t <br /> TEMPERATURE COMPENSATION(TC)CALCULATION <br /> NT OF EXPANSION 1/•F3785GT CE A•F CC IN OUT <br /> �GRA �--I _ TEMPERATURE,•F TC = _ OR <br /> SOURCE DTI59C L� TIME .MINUTE <br /> ❑ A ❑ D ❑ CHART <br /> ❑ B ❑ E ❑ PUBLISHED DATA AT 60-F IF <br /> ❑ C ❑ OTHER TC = f <br /> TANK 1 TANK 2 <br /> SYSTEM CAPACITY,GALLONS .>✓J GT TANK 1 TANK 2 TANK 3 TOTAL <br /> AOF �•F <br /> t Temp. Differential tvd.� TC- <br /> TTlmaofTemp. / ^ ATime <br /> Differential, Min. <br /> ABSOLUTE LEAK RATE(ALR)CALCULATION <br /> ABSOLUTE LEAK RATE = -1, '/ — -�" S- - _ - <br /> LEAK RATE TEMP.COMPENSATION CC/MIN <br /> _ - X 0.015852• _ �'O�3 <br /> CC/MIN GAL/HOUR <br /> ❑ IF ALR 1 f 0.05 GPH,A CHECK TEST WAS CONWCTED WHICH CONFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> •60 MINUTES/HOUR T 3785 CC/GALLON-0.015882 <br />